Laserfiche WebLink
0 <br /> TABLE 1-SUMMARY OF RESULTS OF GROUNDWATER SAMPLING <br /> BP OIL COMPANY SERVICE STATION NO.11219 <br /> 1403 COUNTRY CLUB BOULEVARD,STOCKTON,CALIFORNIA <br /> ALISTO PROJECT NO.10-037 <br /> WELL DATE OF CASING DEPTH TO GROUNDWATER TPH-G B T E X LAB <br /> ID SAMPLINGI ELEVATION (a) WATER ELEVATION (b) (ppb) (ppb) (Ppb) (Ppb) (Ppb) <br /> MONITORING (Feet) (Feet) (Feet) <br /> QC-2 (e) 09/18/92 -- — ND<50 ND<0.5 ND<0.5 ND<0.5 ND<0.5 ANA <br /> OC-2 (e) 12/09/92 — — ND<50 ND<0.5 ND<0.5 ND<0.5 ND<0.5 ANA <br /> QC-2 (a) 03/11/93 — — — ND<50 ND<0.5 ND<0.5 ND<0.5 ND<0.5 PACE <br /> 00-2 (e) 06/15193 --- -- -- ND<50 ND<0.5 ND<0.5 ND<0.5 1.3 PACE <br /> QC-2 (e) 09/15193 — --- - ND<50 ND<0.5 ND<0.5 ND<0.5 0.7 PACE <br /> ABBREVIATIONS: NOTES: <br /> TPH-G Total petroleum hydrocarbons as gasoline (a) Casing elevations surveyed on August 20,1991, <br /> B Benzene <br /> T Toluene to the nearest 0.01 foot relative to mean sea levet. <br /> E Ethylbenzene (b) Groundwater elevations in feet relative to mean sea level. <br /> X Total xylenes <br /> ppb Parts per billion (c} MW-2 destroyed on February 5,1991. <br /> ND Not detected above reported detection limit <br /> Not analyzedlavatlable/measured (d) Blind duplicate. <br /> PRE Precision Analytical Laboratory <br /> ANA Anametrix,Inc. (e) Travel blank. <br /> PACE Pace,Inc. <br /> i <br /> i <br /> 10-Nov-93 <br /> PAGE 3 of 3 <br />