Laserfiche WebLink
ALISTO ENGINEERING GROUP <br /> Groundwater Development and Sampling Form <br /> Client: D1 Date: /� 3 <br /> Alisto Project No: 10—C)-32 Field Personnel: <br /> Service Station No: 1 of Address: <br /> • r <br /> Well ID: NW' Field Activity: Well Development XWell Sampling Product Bailing <br /> Casing Diameter: Purge Method: Well Data: <br /> _2 Inch (0.16 Gal/foot) Pump (dispos. Poly Tubing) Depth to Product <br /> _3 Inch (0.37 Gal/foot) Disposable Bailers Product Thickness <br /> AC4 Inch (0.65 Gal/Foot) _Other ILLLrDepth to Water <br /> 4.5 Inch (0.83 Gal/foot) 1.66 PVC Standard Bailer <br /> 6 Inch (1.47 Gal/foot) _3.50 PVC Standard Bailer <br /> Sampling Method: Decontamination Method: <br /> X-asposable Bailer X Triple Rinse (Liquinox) <br /> Pumv Steam Cleaned <br /> Calculated Pure Volume _3 <br /> ''TU ft �GavFt 1�.� Galx <br /> Total Depth Depth to Water Conversion Casing Vol Vols to Total <br /> of Well Water Column Factor Purge Volume <br /> Well Develo ment/Sam ling Parameters <br /> Time Temp pH Cond. Purge Comments/ Analysis Container Presery <br /> OF (umbos/ Vol Turbidity Required Type <br /> cm) (Gal? <br /> 01'1 <br /> boo TPH- VOA HCL <br /> 113) 176 7. (j2 G/STEX <br /> 1 TPH- Amber Solvent <br /> 3 + <br /> ` -791 I .O F )3 Diesel Liter Rinsed <br /> HLf 77?� a„ I - i *;- )-O EPA 603 VOA <br /> O I L( TOG Amber HSO, <br /> 1 I` 5520BF Liter <br /> K 73ao1 132 <br /> FORM:Fs3nn592 <br />