Laserfiche WebLink
`Birch Technical Services GROUND-WATER SAMPLING FORM <br /> 116 Liberty Street <br /> Santa Cruz, Ca 95060 Well Number: —,6 <br />,pr <br /> (408) 459-0718 <br /> project Number: 1� -0�3 �_ Well Type: Monitor OExtraction <br /> Station Number. <br /> Dater [81Sampled by: Dp'V4R�I'FgJ' <br /> WELL P�JRG-ING <br /> PURGE Casing Diameter (inches) O 2" 03" �4" 04.5" 06" 0 <br /> VOLUME Volume Factors: 0.1632 0.3672 0.6528 0.826 1.469 <br /> Initial Water Level: �l fC <br /> Total Depth of Well (BOW) PURGE METHOD: <br /> O Honda Pomp <br /> Total Volume Purged: Time Elapsed: 2- 5 ODisposable PolyTubing ft) <br /> disposable PVC Bailer(}� <br /> OQther <br /> Calculated Purge Volume: <br /> � ,y` = x – (gallons) <br /> - ,31►0l = _ x <br /> Total Depth Water Level Well Vol.Fac. #of vol.to Purge Calculated Purge Volume <br /> ub•ec ive Analysis Prior to Pur in PARAMETER EQUIPMENT CALIBRATION <br /> SHEE Depth of Product Emuls' H Meter#: Time: <br /> OYes a (ft) Oyes o P <br /> Solution pH 4.00 at 71 °(F <br /> C® MENTS: Solution pH 10.00_19—at %/ °( <br /> Solution pH 7.00 / at <br /> Water Level Meter#: (P 713 <br /> SAMPLING METHOD <br /> 00,VC Disposable Bailer Time Sampled <br /> OTeflon Bailer <br /> OOther: <br /> WELL SAMPLING PARAMETERS <br /> Gallons TimeTo H Cond. Analysis No. Conte preservatives <br /> Removed ¢ (umhos/cm) Required of Type <br /> 5 f �S 7 3• , C a a t• cI EPA 601 VOA's <br /> 0 Z C q-vol 7 -34 6,0 f Z �C TPH-G/BTEX !Els <br /> HCl <br /> �j f00 7 4 -6 6 , 7 TPH- Diesel err <br /> TOG 5520 BF Amber H2NO3 <br /> Liter <br />