Laserfiche WebLink
WELL MONITORINGIDEVELOPMENT <br /> FIELD DATA SHEET <br /> Client/ Job#: <br /> Faculty <br /> address { f? Date: <br /> } 1 C Sampler: <br /> City: <br /> Well ID Well Condition. <br /> Well Diameter r� Hydrocarbon Amount Bailed <br /> t�� Thickness' Iproductlwater). <br /> Total Depth Volume 2" - 0 17 3 0 38 4" 0 66 <br /> 1 O Factor (VF) 6"= 150 12" = 5 80 <br /> Depth to Water ln <br /> t X c se volume) - Estimated Purge Volume <br /> X VF��� <br /> r <br /> Purge Disposable Bailer Sampling <br /> Equipment- Bailer Equipment: Dis osable Bailer <br /> Stack Bailer <br /> Suction Pressure Bailer <br /> Grundfos Grab Sample <br /> Other Other- <br /> Starting Time 1.0 } { Weather Conditions. S u AAI Y <br /> Sampling Time ) 5 o Water Color 16- � Odor. <br /> Purging Flow Rate. �� `5 qUaL Sediment Description S A MT) <br /> Did well de-water? ID If yes, Time Volume <br />_ Time Volume pH Conductiv-ity Temperature D O ORP A1kaliruty <br /> (gal µmhos/cm "C (mg/L) (mV) (ppm) <br /> 1 <br /> :LC6 9 - <br /> IF <br /> --1-? <br /> LABORATORY INFORMATION <br /> SAMPLE 1D (#} - CONTAINER REFRIG PRESERV 'TYPE LABORATORY ANALYSES / <br /> C <br /> COMMENTS C34 (0 ' — Q) y q <br /> 9197 tteldat trm <br />