Laserfiche WebLink
t , <br /> TABLE *MMARY OF RESULTS OF GROUNDWATER MONITORING <br /> WELL DATE OF CASING DEPTH TO GROUNDWATER TPH-G 8 T E X MTBE DO LAB <br /> 1D SAMPLING/ ELEVATION (a) WATER ELEVATION (b) (ug/L) (ug/L) (ug/L) (ug/L) (uglL) (ug/L) (ppm) <br /> MONITORING (Feet) (Feet) (Feet) <br /> MW-6 08105/91 580 2982 -2402 ND NO NO ND ND — — PRE <br /> MW-6 08/15/91 580 — — — — — --- --- -- -- — <br /> MW-6 12/09/91 580 3042 -2462 NO ND NO ND ND — — PRE <br /> MW-6 03/09/92 580 2953 -2373 NO NO NO ND ND --- — PRE <br /> MW-6 06/19/92 580 2924 -2344 ND<50 ND<0 5 ND<0 5 ND<O 5 ND<O 5 — — ANA <br /> MW-6 09/18/92 580 3103 -2523 ND<50 ND<0 5 ND<O 5 ND<O 5 ND<0 5 --- — ANA <br /> MW-6 12/09192 580 3142 -2562 ND<50 ND<0 5 ND<0 5 ND<O 5 ND<O 5 — — ANA <br /> MW-6 03/11/93 580 2895 -2315 ND<50 ND<O 5 ND<O 5 ND<O 5 N0<0 5 — --- PACE <br /> MW-6 06115/93 580 2691 -2111 ND<50 ND<0 5 ND<O 5 ND<O 5 ND<O 5 --- — PACE <br /> MW-6 09/15/93 580 2729 -21 49 - — — — — — <br /> MW-6 12/22/93 580 27 17 -21 37 ND<50 ND<O 5 ND<O 5 ND<O 5 ND<O 5 PACE <br /> MW-6 04101/94 580 2629 -2049 — - -- - -- — — <br /> MW-6 07127194 580 2632 -2052 ND<50 ND<0 5 ND<O 5 ND<0 5 ND<O 5 ND<5 0 36 PACE <br /> MW-6 11/30/94 580 2680 -21 00 — — — --- --- — — <br /> MW-6 02/15/95 580 2573 -1993 ND<50 ND<0 50 ND<0 50 ND<O 50 ND<1 0 -- 39 ATI <br /> MW-6 04/21/95 580 2374 -1794 — — — - -- — <br /> MW-6 07/21/95 580 2298 -1718 ND<50 ND<O 50 ND<0 50 ND<O 50 ND<1 0 — 63 ATI <br /> MW-6 (e) 10120/95 580 2339 -1759 ND<50 ND<0 50 ND<O 50 ND<O 50 ND<1 0 67 73 ATI <br /> MW-6 10120/95 580 — — ND<50 1 5 067 ND<O 50 ND<1 0 ND<5 0 65 ATI <br /> MW-6 (e) 04123/96 580 2000 -1420 ND<500 ND<5 ND<5 ND<5 13 2700 --- SPL <br /> MW-6 04123/96 580 -- — ND<500 ND<12 ND<12 ND<12 ND<12 4100 — SPL <br /> MW-6 07/12/96 580 2022 -1442 — — — — --- --- --- -- <br /> MW-6 10118/96 580 1942 -1362 2300 10 ND<1 0 ND<1 0 ND<1 0 7900 44 SPL <br /> MW-6 02126/98 580 1160 -580 490 N0<0 5 ND<1 0 ND<1 0 ND<1 0 590 49 SPL <br /> QC-1 (d) 02126/98 --- — — 460 ND<O 5 ND<1 0 ND<1 0 ND<1 0 680 --- SPL <br /> MW-6 07/07/98 580 1155 -575 ND<50 ND<O 5 ND<1 0 ND<1 0 ND<1 0 ND<10 37 SPL <br /> MW-6 01/19/99 580 1349 -769 7300 ND<1 0 ND<1 0 ND<1 0 ND<1 0 9700 — SPL <br /> MW-6 07/14/99 580 1255 -675 1000 ND<1 0 ND<1 0 ND<1 0 ND<1 0 1100 --- SPL <br /> MW-6 10/07/99 580 1410 -830 4900 ND<1 0 ND<1 0 ND<1 0 ND<1 0 4200 — SPL <br /> MW-6 01120/00 580 1433 -853 ND<50 ND<O 5 ND<O 5 ND<O 5 ND<O 5 6200 --- PACE <br /> MW-6 04111/00 580 1525 -945 77 ND<O 5 ND<0 5 ND<O 5 ND<O 5 180 --- PACE <br /> MW-6 07/14/00 580 1197 -617 55 ND<O 5 ND<O 5 ND<O 5 ND<O 5 150 — PACE <br /> MW-6 10/26/00 580 1360 -780 1300 100 79 11 72 2200 — PACE <br /> MW-6 01/16/01 580 1339 -759 1200 206 ND<O 5 ND<O 5 ND<O 5 1700 — PACE <br /> MW-6 04/12/01 580 1193 -613 120 ND<O 5 ND<O 5 ND<O 5 ND<1 5 157 --- PACE <br /> MW-6 07/23/01 580 1356 -776 200 ND<0 5 ND<0 5 ND<0 5 ND<1 5 254 — PACE <br /> I <br /> Blaine Tech Services,Inc,Report 010723-K-2,BP Oil 11192 at 1403 Country Club Blvd,Stockton,Califomia Page 7 <br />