Laserfiche WebLink
GETTLER - RYAN <br /> INC. <br /> • <br /> January 9, 2001 <br /> Mr David J Camille <br /> Tosco Marketing Company <br /> 2000 Crow Canyon Place, Suite 400 <br /> San Ramon, CA 94583 1 - <br /> RE: Fifth Weekly Event of December 12,2000 <br /> Groundwater Purging and Disposal <br /> Tosco(Former BP) No. 11192 <br /> 1403 Country Club Boulevard,Stockton, California <br /> Mr Camille <br /> At the request of Tosco Marketing Company (Tosco), Gettler-Ryan Inc (GR) has prepared this <br /> report to document groundwater sampling, purging and disposal conducted for the subject site <br /> The work was performed in accordance the GR's Work Plan for Groundwater Purging and <br /> Disposal, dated September 6, 2000, and with the San Joaquin County Environmental Health <br /> Division correspondence dated November 2, 2000 <br /> Groundwater Purging and Disposal <br /> • On December 12, 2000 approximately 3,500 gallons of groundwater were removed from <br /> monitoring well MW-3 by Onyx Industrial Services (Onyx) of Benicia, California The <br /> groundwater was purged directly from the well into a Onyx vacuum truck and transported to the <br /> Tosco Refinery in Rodeo,California for disposal <br /> Groundwater Sampling <br /> Groundwater samples were collected from MW-3 prior to and following purging A water <br /> sample was also collected from the purged groundwater prior to its removal from site <br /> Groundwater samples are submitted under Chain of Custody for analysis at Sequoia Analytical <br /> (ELAP # 127 1) Groundwater samples are analyzed for Total Petroleum Hydrocarbons as <br /> Gasoline (TPHg) by EPA Method 8015, benzene, toluene, ethylbenzene, and xylenes (BTEX) by <br /> EPA Method 8020, and methyl tert-butyl ether (MTBE) by EPA Method 8260 The analytical <br /> results for the December 12, 2000 sampling event are summarized in Table 1 <br /> MTBE Mass Removal <br /> The estimated mass of MTBE removed was calculated using the average MTBE concentration <br /> from the pre-purging (MW-3-PRE) and post-purging (MW-3-POST) grab groundwater samples <br /> Based on this average concentration, an estimated total of 3 19 pounds of MTBE was removed <br /> from the site during the December 12, 2000 purging event The estimated MTBE removed, the <br /> cumulative MTBE removed, and the calculation method are presented in Table 1 <br /> 6747 Sierra Court , Suite J Dublin , California 94568 { 925 ) 551 - 7555 <br />