Laserfiche WebLink
TABLE 1 -SUMMARY OF RESULTS OF GROUNDWATER MONITORING <br /> WELL DATE OF CASING DEPTH TO GROUNDWATER TPH-G B T E X MTBE DO LAB <br /> ID SAMPLING/ ELEVATION (a) WATER ELEVATION (b) (ugll) (ugll) (ugll) (ug") (Ug/1) (ug1l) (ppm) <br /> MONITORING (Feet) (Feet) (Feet) <br /> MW-7 10/07/99 621 1464 -843 33000 ND<1 0 ND<1 0 11 ND<1 0 19000 — SPL <br /> MW-7 01120!00 621 1515 -894 200 16 ND<O 5 ND<0 5 ND<O 5 25000 -- PACE <br /> MW-7 04/11/00 621 1540 -919 2500 33 ND<O 5 ND<0 5 053 63000 — PACE <br /> MW-7 07114!00 621 1251 -630 2500 38 ND<O 5 41 10 55000 --- PACE <br /> QC-2 (g) 09/18/92 --- — -- ND<50 ND<O 5 ND<0 5 ND<O 5 ND<O 5 --- -- ANA <br /> QC-2 (g) 12/09/92 -- — --- ND<50 ND<O 5 ND<0 5 ND<O 5 ND<0 5 — --- ANA <br /> QC-2 (g) 03/11/93 - -- ND<50 ND<O 5 ND<O 5 ND<O 5 ND<0 5 -- -- PACE <br /> QC-2 (g) 06/15/93 --- -- --- ND<50 ND<0 5 ND<O 5 ND<0 5 13 -- --- PACE <br /> QC-2 (g) 09/15/93 — -- -- ND<50 ND<0 5 ND<O 5 ND<O 5 07 -- — PACE <br /> QC-2 (g) 12/22193 --- --- -- ND<50 ND<O 5 ND<O 5 ND<0 5 ND<O 5 — — PACE <br /> QC-2 (g) 04/01/94 - -- -- ND<50 ND<0 5 ND<O 5 ND<O 5 ND<O 5 — -- PACE <br /> QC-2 (g) 07/27/94 — -- -- ND<50 ND<O 5 ND<0 5 ND<O 5 ND<O 5 -- — PACE <br /> QC-2 (g) 11/30/94 -- — — ND<50 ND<0 5 ND<O 5 ND<O 5 ND<0 5 — — PACE <br /> QC-2 (g) 02/15/95 -- — ND<50 ND<O 50 ND<0 50 ND<O 50 ND<1 0 --- ATI <br /> QC-2 (g) 04/21195 --- --- -- ND<50 08 15 ND<0 50 ND<1 0 --- --- ATI <br /> QC-2 (g) 07/19/95 -- -- -- ND<50 ND<0 50 ND<O 50 ND<O 50 N0<10 — -- ATI <br /> QC-2 (g) 10/20/95 — --- -- ND<50 ND<0 50 ND<O 50 ND<O 50 ND<1 0 ND<5 0 — ATI <br /> QC-2 (g) 04/23/96 -- -- — ND<500 ND<O 5 ND<O 5 ND<O 5 ND<O 5 ND<10 SPL <br /> QC-2 (g) 07/12/96 — — -- ND<50 ND<O 5 ND<1 ND<1 ND<1 ND<10 -- SPL <br /> Blaine Tech Services,Inc,Report 000714-N-1 BP Oil 11192 at 1403 Country Club Blvd Stockton,California Page 7 <br />