Laserfiche WebLink
ail <br /> BP WELL MONITORING DATA SHEET' <br /> *Project # 7Station # I j("i`2- <br /> Sampler Date <br /> Well I D. 0 a; -3 Well Diameter ? 3 6 8 <br /> Total Well DepthDepth to Water ' = <br /> Depth to Free Product Thickness of Free Product (feet) <br /> Referenced to q vc Grade D 0 Meter (if req'd) Ysl HACH <br /> Well Diameter Mulpp Well Diameter Multiplier <br /> 2' 0 16 5" 1 02 <br /> 3' 037 6" 1 47 <br /> A 065 Other radius'-0 163 <br /> Purge Method Bailer Sampling Method Bailer <br /> Disposable Bailer Disposable Bailer-J� <br /> Middleburg Extraction Pori <br /> Electric SubmersibleS-, Other <br /> Extraction Pump <br /> Other <br /> }; _ Gals <br /> 1 Case Volume(Gals) Specified Volumes Calculated Volume <br /> Time Temp (°F) pH Cond Gals Removed Observations <br /> 7110 <br /> i� 4r <br /> 1 <br /> Did well dewater? Yes Gallons actually evacuated �4,,) <br /> Samplinc Time =,fit Samplinc, Date i/2-t, <br /> Sample I D (Blind) Laboratory Orr Other <br /> Analyzed for TPH-G BTEX MTBE,' TPH-D Other <br /> EOR <br /> �f fea'd) Pre-purge m�'L Post-purge ma�� <br /> (if req'd) Fre-purge mV1 <br /> Post-purge ,mV <br />