My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0006610
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1403
>
2900 - Site Mitigation Program
>
PR0505513
>
ARCHIVED REPORTS XR0006610
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2019 10:28:11 AM
Creation date
6/21/2019 9:11:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006610
RECORD_ID
PR0505513
PE
2950
FACILITY_ID
FA0006438
FACILITY_NAME
United # 5446
STREET_NUMBER
1403
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12323246
CURRENT_STATUS
02
SITE_LOCATION
1403 W COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Corrective Action Plan—Tosco(76)Service Station No 11192, Stockton, California <br /> March 13,2002 <br /> 4) GR tests at other sites indicates the ability of an ozone air mixture <br /> to degrade MtBE, which is the main constituent of concern <br /> DISADVANTAGES 1) Areas outside of the injection point radius of influence may take <br /> longer to treat <br /> 2) Might be difficult to treat large areas <br /> CONCLUSION Initial results of GR field tests at other sites indicate that this is a feasible <br /> remedial technique for treating MtBE and other petroleum compounds at <br /> this site <br /> FEASIBILITY STUDY Continued <br /> 1 For all sites, each recommended alternative shall be designed to mitigate <br /> nuisance conditions and risk of fire or explosion: <br /> A site Health and Safety Plan (HSP) will be prepared for the recommended <br /> scope of work The HSP will be strictly followed in order to ensure site and <br /> community safety <br /> 2 For sites where unauthorized release affects or threatens water with <br /> current or potential beneficial uses designated in water quality control <br /> plans, the feasibility study shall also identify and evaluate at least two <br /> alternatives for restoring or protecting these beneficial uses: <br /> As previously stated in this CAP, it does not appear that the hydrocarbons <br /> that are present at the subject site threaten any surface water or wetlands in <br /> the vicinity of the site that have a current or potential beneficial use <br /> However, the groundwater in the vicinity of the site has been classified by the <br /> RWQCB as an area of current and/or potential beneficial use Therefore, GR <br /> recommends installation of an ozone microsparge system to remediate the <br /> impacted groundwater beneath the site <br /> The existing groundwater monitoring wells are currently monitored and sampled quarterly This <br /> program will be continued and modified, as appropriate, to provide verification monitoring of <br /> corrective action effectiveness and progress towards cleanup levels <br /> 140245 08 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.