My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0006633
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1403
>
2900 - Site Mitigation Program
>
PR0505513
>
ARCHIVED REPORTS XR0006633
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2019 10:35:20 AM
Creation date
6/21/2019 9:15:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006633
RECORD_ID
PR0505513
PE
2950
FACILITY_ID
FA0006438
FACILITY_NAME
United # 5446
STREET_NUMBER
1403
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12323246
CURRENT_STATUS
02
SITE_LOCATION
1403 W COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ay� <br /> SEIC ® R <br /> 1 t <br /> Groundwater has been monitored and sampled on a quarterly basis from 1991 to the present M <br /> During the year of 1997, groundwater was not monitored or sampled During the past year (2003) <br /> groundwater flow has been toward the northeast Maximum reported concentration of MtBE and <br /> TBA during the fourth quarter 2003 were 140 ppb (MW-11)and 160,000 ppb (MW-7), respectively <br /> F� <br /> RECENT QUARTER ACTIVITIES (Fourth Quarter 2003) <br /> 1 Performed quarterly groundwater monitoring and sampling (TRC) <br /> 2 Prepared and submitted a quarterly summary report <br /> 3 Performed ozone sparge system operation and maintenance <br /> NEXT QUARTER ACTIVITIES (Fourth Quarter 2003) <br /> 1 Prepare and submit a quarterly summary report <br /> r <br /> 2 Perform quarterly groundwater monitoring and sampling <br /> 3 Perform ozone sparge system operation and maintenance <br /> CHARACTERIZATION/REMEDIAL STATUS <br /> Soil contamination delineated? Yes <br /> Dissolved groundwater delineated? No <br /> Free product delineated? NIA <br /> Soil/Groundwater remediation in progress? Yes <br /> Start? Dec 2002 <br /> Anticipated completion date? 2005 <br /> RECOMMENDATIONS/DISCUSSIONS <br /> Continue operation of the ozone sparge remedial system and quarterly monitoring and sampling <br /> CONSULTANT: SECOR International Incorporated <br /> r <br /> 4 <br /> s <br /> h <br /> n <br /> a <br /> • <br /> s <br />
The URL can be used to link to this page
Your browser does not support the video tag.