Laserfiche WebLink
S 1EC0R <br /> a <br /> NEXT QUARTER ACTIVITIES (First Quarter 2006) <br /> 1 Groundwater monitoring and sampling event will be performed by TRC <br /> 2 Continue operation and perform monthly maintenance of the on-site OS system <br /> 3 Obtain permits and complete the installation of additional wells in accordance <br /> with the Work Plan for Additional Site Assessment dated October 18, 2005 <br /> LIMITATIONS <br /> This report presents our understanding of existing conditions at the subject site The <br /> conclusions contained herein are based on the analytical results, and professional <br /> judgment in accordance with current standards of professional practice, no other <br /> warranty is expressed or implied SECOR assumes no responsibility for exploratory <br /> borings or data reported by other consultants or contractors <br /> Sincerely, <br /> SECOR International Incorporated <br /> Kristen Flesoras OQRpFESS/0/V <br /> Associate Scientist �Q-j��'�E B�Nk0O'�. <br /> pz�__ s��� <br /> LU 83 m <br /> a EXP 7213112006 <br /> * * s <br /> Rusty Benkosky E s C10- <br /> Principal Engineer �9TE0FCAI.IFO�� <br /> Attachments Table 1 --Ozone Infection — System Operational Data <br /> Table 2 —Ozone Infection —Groundwater Monitoring Data <br /> Figure 1 —Site Plan with Ozone Sparge System Layout <br /> Figure 2 —GRO, MtBE, and TBA Concentrations in Groundwater— <br /> Well MW-3 <br /> Figure 3 —GRO, MtBE, and TBA Concentrations in Groundwater— <br /> Well MW-4 <br /> Attachment 1 —TRC's Quarterly Monitoring Report, October through <br /> December 2005 Dated December 27, 2005 <br /> Attachment 2 — Remediation System Field Data Sheets <br /> Attachment 3— Remediation System Certified Laboratory Analytical <br /> Reports and Chain-of-Custody Documentation <br /> I I13P-ARC01111921Reports\QMR-QRPS1200SWO2005 QSSR and QRPS doe s <br />