Laserfiche WebLink
07 April 2003 <br /> ' AGE-NC Project No 98-0465 <br /> Page 4 of 4 <br /> ' Preparation of a work plan to delineate the lateral extent of MTBE-impacted ground water <br /> at the site <br /> 6.0. LIMITATIONS <br /> ' Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based upon <br /> analytical results provided by an independent laboratory Evaluation of the hydrogeologic conditions <br /> at the site for the purpose of this investigation was made from a limited number of available <br /> ' subsurface data points (i e ,monitoring wells and ground water samples)and subsurface conditions <br /> may vary away from these data points No other warranty, expressed or implied, is made as to the <br /> professional opinions, interpretations and recommendations contained in this report <br /> I <br /> I <br /> i , <br /> 1 <br /> 1 <br /> ' Advanced GeoEnvironmental,Inc <br />