Laserfiche WebLink
i <br /> 03 February 2003 <br /> ' AGE-NC Project No 98-0465 <br /> Page 4 of 4 <br /> ' 5.0. RECOMMENDATIONS <br /> Based on the findings of this Investigation, AGE recommends <br /> c Continued quarterly monitoring of the ground water monitoring wells The next monitoring <br /> event should be performed in February 2003 <br /> ' G Preparation of a work plan to delineate the lateral extent of MTBE-Impacted ground water <br /> at the site <br /> ' 6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> ' environmental consultants practicing in this or similar localities The findings were based upon <br /> analytical results provided by an independent laboratory Evaluation of the hydrogeologic conditions <br /> at the site for the purpose of this investigation was made from a limited number of available <br /> subsurface data points(I e ,monitoring wells and ground water samples)and subsurface conditions <br /> may vary away from these data points No other warranty, expressed or Implied, is made as to the <br /> professional opinions, Interpretations and recommendations contained in this report <br /> 1 <br /> i <br /> i <br /> ' Advanced GeoEnvironmental,Inc <br />