My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1876
>
2900 - Site Mitigation Program
>
PR0542421
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2019 12:25:09 PM
Creation date
6/21/2019 10:07:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0542421
PE
2950
FACILITY_ID
FA0024377
FACILITY_NAME
COUNTRY CLUB BLVD/295950
STREET_NUMBER
1876
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12319101
CURRENT_STATUS
01
SITE_LOCATION
1876 COUNTRY CLUB BLVD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WESTERN 1386 EAST BEAMSR STREET <br /> WOODLAND CA 95776-6003 <br /> GEO-ENGINEERS (530)668-5300, <br /> FAX(530)662-0273 <br /> REGISTERED GEOLOGISTS wege@caE.Ret <br /> Ms.Lisa Medina June 1,2012 <br /> Leaking Underground Fuel Storage Tank Program <br /> San Joaquin County Public Health <br /> Environmental Health Division (PHS-FHD) <br /> 600 East Main Street <br /> Stockton,CA. 95202 <br /> (209)468-3455 <br /> RE: Amended Work plan for Site Restoration, destruction of excavation well MW 10 at former <br /> Sanchez property located at 1876 Country Club Blvd., Stockton, California 95203. <br /> Dear Ms.Medina: <br /> ]INTRODUCTION <br /> The work plan to destroy the wells associated with this site was approved in correspondence from <br /> Mr. Michael Infurna on February 6, 2012, with modification to the destruction of the excavation <br /> well MW 10, which was originally proposed to be pressure grouted, due the installation of the well <br /> into the pea gravel backfill of the excavation area. Mr. Infurna along with Mr. Nuel Henderson <br /> determined that the well nee -t4 be over drilled, by first setting conductor casing or sonic casing <br /> over the well to the 28 foot depth, drill out the well to the 28 foot depth, pressure grout the bottom <br /> 24 —28 foot depth, place pea gravel backfill as the conductor or sonic piping is removed. Remove <br /> the surface vault and place compacted road base to within 4 inches of surface and seal the surface <br /> with asphalt. <br /> Only two drilling contractors contacted can perform the conductor and/or sonic placement to drill <br /> out the well contents. Both contractors estimated the cost for destroying MW 10 over $6,000.00 <br /> and an entire day, which does not include Western Geo-Engineers time for supervision and health <br /> and safety. The budget to destroy the wells and restore the site was presented to the UST fund in <br /> .May of 2011 for the fiscal year 2011/2012 and did not anticipate the placement of conductor casing <br /> and drill out of the well. j <br /> i <br /> A seemingly more cost effective and adequate method of destroying MW 10 is proposed. To not <br /> over drill the well (not disturbing the pea gravel). Cut the exposed casing in the well vault, flush <br /> with the floor of the vault. Backfill the well with bentonite chips, allow the chips to hydrate for 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.