Laserfiche WebLink
DEL-TECH Geotechnical Support Services <br /> MONITORING WELL FIELD LOG <br /> PROJECT NAME*Wab Refrigeration AMPLE ANALYSIS PERFORMED TAH-GASIB T X E <br /> 1876 Country Club AMPLE TIME. 12 08 <br /> Stockton, CA AMPLE CONTAINER(S) 3 V O A'S <br /> NALYSIS PERFORMED BY SHERWOOD LABS <br /> CLIENT. MANUEL SANCHEZ DATE: 02/01/96 <br /> PROJECT MANAGER: BILL HUNTER SAMPLE LOCATION MW-2 <br /> AMPLER DON LIGHT START TIME. <br /> GROUNDWATER: XXX ADOSE OTHER: P I D WELL HEAD READING 4 0 PPM <br /> CASING ELEVATION: FEET MSLCASING DIAMETER 2 INCH <br /> DEPTH TO WATER 18 51 FEET CALCULATED CASING VOLUME 2 53 GAL <br /> DEPTH OF WELL: 34 06 FEET rTOTAL VOLUME PURGED 7 5 GAL <br /> TIME VOLUME pH E.C. TEMP COLOR OTHER <br /> alions units Umhos/cm Degrees C Visual <br /> • 0 68 1912 205 CLEAR SLIGHT ODOR <br /> 25 67 1919 207 " <br /> 50 68 1919 209 <br /> 75 68 1922 208 " <br /> PURGE METHOD . CENTRIFUGAL PUMP <br /> SAMPLE METHOD: 3 FOOT STAINLESS STEEL BAILER <br /> DEPTH TO WATER AFTER PURGE 1$ 63' DEPTH TO WATER AT SAMPLE TIME <br /> WELL INTEGRITY. CAP AND SEAL ARE SECURE, LOCK IS INSTALLED <br /> REMARKS- GOOD RECHARGE <br /> WEATHER- CLEAR AND COOL <br /> QUALITY CONTROL: ALL PURGING EQUIPMENT AND SAMPLING EQUIPMENT WAS CLEANED <br /> IN THE FIELD WITH ALCONOX <br /> NEW NITRILE GLOVES WERE WORN AT ALL TIMES <br /> WELL LOCATION- WELL IS LOCATED ON THE SOUTH/EAST CORNER OF FRONT LOT <br /> CONTAINMENT. D O T 17 STEEL DRUM <br /> INSTRUMENTATION, ORION pH/TEMPERATURE METER 2 POINT pH CALIBRATION (4 0 & 7 0) <br /> ORION CONDUCTIVITY METER <br /> ENVIRONMENTAL INSTRUMENTS SLOPE METER <br /> KECK PRODUCT INTERFACE METER <br /> THERMODYNE 580B PHOTO IONIZATION DETECTOR <br />