Laserfiche WebLink
i <br /> a survey is going to be conducted within the next few weeka. <br /> 2. The groundwater sampling conducted in November did nuL <br /> include an analysis for solvents, (EPA 502. 1, ) as ruquested by <br /> your office; those instructions were not given to Lhe uumplins <br /> firm prior to doing the work, and the testing lab used' uould noL <br /> perform that procedure. That additional test will be performed <br /> on Ws #1 & #3 when sampling is done at the end of Jduuary, <br /> 1994. <br /> Due to some difficulty is locating properly qualified personel, a <br /> title search of the surrounding area has not yet been performed. <br /> However, we have recently found such an individual, and have <br /> arranged for the work to be done prior to the end of the year. <br /> Because of this delay, we request a 30 day extension, until Feb. <br /> 1, 1994, to comply with your instructions to submit a workplan <br /> for additional investigative work. <br /> Sin�cly, <br /> W <br /> Wm. Peth <br /> unter & Associates <br /> cc= anchez <br /> Thayer, CRWQCB <br />