My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0005805
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1876
>
2900 - Site Mitigation Program
>
PR0542421
>
ARCHIVED REPORTS XR0005805
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2019 2:42:38 PM
Creation date
6/21/2019 10:21:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005805
RECORD_ID
PR0542421
PE
2950
FACILITY_ID
FA0024377
FACILITY_NAME
COUNTRY CLUB BLVD/295950
STREET_NUMBER
1876
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12319101
CURRENT_STATUS
01
SITE_LOCATION
1876 COUNTRY CLUB BLVD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WESTERN 1 86 1 V,I til ANII K S I R1 I I <br /> GEO-ENGINEERS WOOD] AND( n 94;770 r,nc1� <br /> Eza <br /> (5 30) 668-51)00 <br /> CAI 11 C ON i RAC I OR tl513857 1 AX 1 X34)662-0273 <br /> Iii (JI51 1121 D(E1 01 O(,1 )1 nLgi rI IllulhU Lnm <br /> Mr Michael J Infurna Jr May 2, 2000 <br /> San Joaquin County EHD <br /> 304 East Weber Ave , Third Floor <br /> Stockton, CA 95201-0388 rY j <br /> Deai Mi Infurna <br /> Please find enclosed one copy of Western Geo-Engineer's "January-Match 2006 <br /> Quart( t ly Groundwater Monitoring Report for Sanchez Property, 1876 Countiy Club, - <br /> Blvd , 5toc,kton, CA" dated Apel 24, 2000 <br /> fhc LLCOmmendations of this most recent quarterly groundwater monitoring i�,poit <br /> Inc,ludL the construction of a workplan to provide spcclficatrotls lot the lollowing Items <br /> that have been pre-approved by the US t Cleanup Fund Program <br /> o Install offsite monitor well west of MW 1 to define downgradient extent of <br /> groundwater contamination plume <br /> o Conduct pump test at existing on-site monitor well to determine feasibility of <br /> dcwateiing during overexcavation of former UST area and/or dewatering in <br /> conjunction with vapor cxti action <br /> a Conduct airsparging/vapor extraction pilot test using an sparging in conJunc.tton with <br /> the installation of horizontal vapor collection piping within a backfilled trench that <br /> traverses the former UST area <br /> We have, received pre-approval of costs from the UST Cleanup 1-und In the amount 01 <br /> $26, 799 85 to Implement these rcLommendations and use the resulting Information to <br /> PILpat- a COIIC .tive Action flan fol the site <br /> The above information was also Included in the cover letter accompanying the Octobei- <br /> Dccember 1999 Quarterly monitoring report for the site 1 asked you then to provide <br /> written (,oinrnent on whether your office would require a workplan before piocceding <br /> with any or all of these proposals When I did not receive a response I asked you in <br /> person on February 25, 2000 to please review that letter and respond in witting Please <br /> respond so that we may proceed with the Investigation and remediation of this site <br /> Sincetcly , <br /> David I,Izrel all <br /> Western Geo-Engineers <br /> Cc MI and MIs Manuel Sanchez <br />
The URL can be used to link to this page
Your browser does not support the video tag.