Laserfiche WebLink
The groundwater in the vicinity of the site is unconfined Groundwater elevation at the <br /> site varies from a wet year high of 7 feet bgs to about35-40 <br /> halfeet <br /> b during <br /> the <br /> ta Phe ious <br /> t <br /> drought period Groundwater flow direction at t e <br /> st <br /> since December 1997 <br /> QUA 'ER X GROUNDWATER MONITORING 5112199 <br /> WEGE and Pittman Well Purging (PWP) personnel collected quarterly groundwater <br /> samples from the five monitor wells aabbreviations, nd acronyms used in Appendix <br /> samplingand <br /> QA/QC, details, methods, procedures, <br /> analysis <br /> DEPTH TOW JER MEASUREMENTS <br /> Depth to water was measured at all wells on May 12, 1999 The measurements were <br /> made from the surveyed elevation at the top of casing at each well using an electrical <br /> air/water interface probe (Table 1) No free product or product sheen was observed in <br /> any of the monitor wells <br /> COLLECTION AND CERTIFIED ANALYSIS OF GROUNDWATER SAMPLES <br /> Following depth to water measurements, WEGE and PWP personnel used a truck <br /> mounted vacuum lift pump and dedicated one inch diameter PVC tubing to purge each <br /> well of three volumes of water <br /> After purging, the wells were allowed to recover to at least 80% of their original well <br /> volumes A groundwater sample was then collected from each well with a polyethylene <br /> bailer and decanted with no headspace into two 40 ml VOA vials containing 0 5 ml HCL <br /> acid as a preservative <br /> The samples were delivered with accompanying chain of custody documentation to North <br /> State Environmental Laboratories (NSE) The certified laboratory (DHS 41753) <br /> analyzed the water samples from each monitor well for concentrations of TPH-G using <br /> EPA method 8015 modified and BTEX and MTBE using EPA method 8020 <br /> DISPOSITION OF WASTEWATER <br /> The purged wastewater was contained on-site <br /> in Environmentallabeled gallon DOT <br /> yic <br /> ms <br /> This wastewater was transported by Evergreen 5 s to tther re ng <br /> facility on July 13, 1999 under a non-hazardous waste manifest (see Appendix D) <br /> 2 Sanchez QM 4-6 1999 <br />