Laserfiche WebLink
The groundwater in the vicinity of the site is unconfined Groundwater elevation at the <br /> 40 site vanes from a wet year high of 7 feet bgs to about 35-40 feet bgs during the previous <br /> drought period Groundwater flow direction at the site has generally been to the west <br /> since December 1997 <br /> QUARTERLY GROUNDWATER MONITORING, 3/3/99 <br /> WEGE and Pittman Well Purging (PWP) personnel collected quarterly groundwater <br /> samples from the five monitor wells at the site on March 3, 1999 See Appendix A for <br /> QA/QC, details, methods, procedures, abbreviations, and acronyms used in sampling and <br /> analysis <br /> DEPTH TO WATER MEASUREMENTS <br /> Depth to water was measured at all wells on March 3, 1999 The measurements were <br /> made from the surveyed elevation at the top of casing at each well using an electrical <br /> air/water interface probe (Table 1) No free product or product sheen was observed in <br /> any of the monitor wells <br /> COLLECTION AND CERTIFIED ANALYSIS OF GROUNDWATER SAMPLES <br /> Following depth to water measurements, WEGE and PWP personnel used a truck <br /> mounted vacuum lift pump and dedicated one inch diameter PVC tubing to purge each <br /> well of three volumes of water <br /> After purging, the wells were allowed to recover to at least 80% of their original well <br /> volumes A groundwater sample was then collected from each well with a polyethylene <br /> bailer and decanted with no headspace into two 40 ml VOA vials containing 0 5 ml HCL <br /> acid as a preservative <br /> The samples were delivered with accompanying chain of custody documentation to North <br /> State Environmental Laboratories (NSE) The certified laboratory (DHS #1753) <br /> analyzed the water samples from each monitor well for concentrations of TPH-G using <br /> EPA method 8015 modified and BTEX and MTBE using EPA method 8020 <br /> DISPOSITION OF WASTEWATER <br /> The purged wastewater was contained on-site in labeled 55 gallon DOT approved drums <br /> This wastewater was transported by Evergreen Environmental Services to their recycling <br /> facility on April 23, 1999 under a non-hazardous waste manifest (see Appendix D) <br /> 2 Sanchez QM 1-3 1999 <br />