Laserfiche WebLink
wells, MW-4 & MW-5, were installed on the site . The results of <br /> that work revealed that the limits of the soil & groundwater <br /> plumes had been located to the east and south TABLE II <br /> summarizes the results of the soil sample analyzes from that <br /> work Refer to WJH report titled "INTERIM ASSESSMENT REPORT & <br /> RESULTS OF GROUNDWATER INVESTIGATION" dated October 25, 1994 for <br /> complete details <br /> December 8, 1995 - Seven (7) shallow soil/water strataprobe holes <br /> were placed to the west and north of the property in order to <br /> establish the limits of contamination in those directions <br /> Details of that work are given in the WJH report titled "NINTH <br /> QUARTERLY GROUNDWATER MONITORING REPORT, INCLUDING RESULTS OF <br /> SOIL/WATER PROBE INVESTIGATION" , dated January 12 , 1996 <br /> RESULTS OF LATEST WORK <br /> On February 25 , 1997 , Wm J Hunter, RG from Wm J Hunter & <br /> Associates, arrived at the site at 081.5 hours & checked the <br /> locations previously marked for the soil probe locations A <br /> Transglobal Environmental Geochemistry (TEG) strata-probe truck <br /> operated by Kurt Koldinger was on location unloading equipment <br /> After discussing the workplan, the truck was mobilized on <br /> location SP-A as shown on PLATE III Work started at 0905 hours; <br /> a modified split-spoon sample chamber was attached to 5 foot <br /> lengths of 2" diameter hollow steel threaded pipe The pipe was <br /> pushed and hammered to 5 ' bgl, and a core was taken from 5 ' -616" <br /> The pipe was retrieved, the sample chamber removed and placed on <br /> a clean flat surface It was carefully opened by the geologist, <br /> the metal sleeves were removed and laid out for examination One <br /> tube was promptly preserved by covering the ends with teflon tape <br /> and plastic end caps & sealing with duct tape The sample was <br /> labeled and placed on ice in a closed chest The remaining <br /> portions of the core were described and noted on the field log <br /> The equipment and core barrel were decontaminated with Alconox <br /> and clean water; new metal tubes were inserted in the sample <br /> chamber, which was attached to the bottom of the drill pompe <br /> Tools were advanced to 10 ' below grade, and a core was taken from <br /> 1.0 ' -1116}' The sample chamber was removed and handled as <br /> described above After cleaning equipment, the tools were <br /> advanced to 15 ' below grade, and a core was taken from 15 ' -16 ' 6" <br /> It was handled and preserved by the same procedures described <br /> above After finishing the hole, it was grouted to the surface <br /> with a cement/bentonite slurry Refer to PLATE V-A for details <br /> of lithology & other pertinent data <br /> The probe truck was repositioned over the spot marked for SP-B, <br /> 3 <br />