Laserfiche WebLink
. ENTRY OBJECTIVIES Perform direct push sampling of soil and ground►►iter using <br /> "GeoProbe" drilling rig with minimal disturbance to site operations. Total depth of probes <br /> approximately 45 feet below the sur face Destroy probe holes same day One probe sued <br /> .hong the south par Ling ai ea of Country Club Blvd and one probe sited along western parking <br /> .ilea of Mission Road. Approximately t►►o weeks after completion of the geoprobe <br /> investigation groundwater monitor ing wells are to be sited one along Country Club Blvd and <br /> one along Mission Road Well installation ►►ill be provide by a truck mounted drilling rig <br /> utilizing flinch hollow stem augers. <br /> SITE ACTIVITIES <br /> 1 Health and Safety tailgate meeting. <br /> 2 Consti uct soil stockpile ai ea on-site <br /> 3 Geo Piobe 2 test holes <br /> 4. Pi essui a gi out place neat cement into pi obe holes Resui face with like mates sal <br /> Clean site <br /> 6 Site locations for gi oundwatei monitor ing ii ells. <br /> 7 Install gi oundwatei monitor ing well along south shoulder of Country Club Blvd <br /> 8 Cnstall gi oundwater monitor ing well along Ni est shoulder of Alission Road <br /> 9 Install gi oundwater i ecovery well on site at 1876 Country Club Blvd. <br /> 10 Clean site <br /> 11 Co►ei excavated soils with plastic Inner. <br /> JOB HAZARD ANALYSES <br /> PHYSICAL HAZARDS <br /> NOISE X TRAFFIC <br /> X UNDERGROUND HAZARDS OVERHEAD HAZARDS <br /> EXCAVATIONSITRENCHES X MECHANICAL EQUIPMENT <br /> X OTHER gasoline i tinge hydrocai bon vapors_ <br /> LEVEL OF PROTECTIN E EQL IMIENT <br /> A B C X D <br /> i <br /> 2SANCHEz DRILLING-HEALTHJSAFETY <br />