My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0006092
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1876
>
2900 - Site Mitigation Program
>
PR0542421
>
ARCHIVED REPORTS XR0006092
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2019 1:16:31 PM
Creation date
6/21/2019 10:26:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006092
RECORD_ID
PR0542421
PE
2950
FACILITY_ID
FA0024377
FACILITY_NAME
COUNTRY CLUB BLVD/295950
STREET_NUMBER
1876
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12319101
CURRENT_STATUS
01
SITE_LOCATION
1876 COUNTRY CLUB BLVD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRAFFIC SAFETY PLAN <br /> GEOPROBE - DRILLING <br /> Shoulder Country Club Blvd. <br /> Using a geopi obe truck mounted di filing rig, continuous core probes "all be driven along the <br /> southern shoulder of Country Club Bl-td, approximately 80 feet west of Afission Road. <br /> Delineating cones will be used to cordon off the work area. See Cal Trans t3gui a 5-6, included <br /> The advance war ning sign will be positioned 200 feet pr ror to the start of the Taper. The taper <br /> %"all consist of delineators spaced at 11 foot offset and will be 115 feet long. A buffer zone will <br /> consist of a not k truck inside of delineators at 55 feet prior- to %work zone. Delineators will be <br /> positioned between the woi k zone (dr filling rig) and ti affic A End of Road Wor k sign will be <br /> positioned 15 feet past the woe k zone <br /> Shoulder Mission Road <br /> Using a geopi obe ti uck mounted di riling i ig, continuous core probes will be driven along the <br /> western shoulder of Mission Road, approximately 30 feet south of Country Club Blvd <br /> Delineating cones will be used to cordon off the work area. See Cal Trans figua a 5-22, <br /> included The advance warning sign will be positioned 200 feet prior to the intersection of <br /> nlrssion Road and Country Club Blvd , along the western shoulder south bound lane of <br /> lirssion Road. The Taper will commence at the southwest cornea of the intersection of Mission <br /> Road and Country Club Blvd. The taper will consist of delineators spaced at 5 foot offset and <br /> will be 15 feet long A buffer zone will consist of a work truck inside of delineators at 15 feet <br /> pr aor to woe k zone. Delineators will be positioned between the work zone (drilling rag) and <br /> ti affic A End of Road Woi k sign will be positioned 15 feet past the ►vol k zone. <br /> DRILLING - MONITOR WELL INSTALLATION <br /> Approximately two weeks after the geoprobe information has been analyzed, ground water <br /> monitor ing i%ells will be sited along Country Club 131,,d and Mission Rad <br /> Shoulder Country Club Blvd. <br /> Using a tr uck mounted drilling r ig with 8 inch Hollow stem augers, a 2 inch PVC groundwater <br /> naonitoi ing well will be installed based on previous geoprobe information The well will be <br /> installed along the southern shoulder of Country Club Blvd, approximately 80 -100 feet west of <br /> Mission Road. Delineating cones will be used to cordon off the work area. See Cal Trans <br /> Figure 5-6, included. The advance warning sign will be positioned 200 feet pi for to the start of <br /> the Taper. The taper will consist of delineators spaced at II foot offset and will be 115 feet <br /> SSANCHEZ DR]LLING- HEALTH/SAFETY <br />
The URL can be used to link to this page
Your browser does not support the video tag.