My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0006092
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1876
>
2900 - Site Mitigation Program
>
PR0542421
>
ARCHIVED REPORTS XR0006092
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2019 1:16:31 PM
Creation date
6/21/2019 10:26:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006092
RECORD_ID
PR0542421
PE
2950
FACILITY_ID
FA0024377
FACILITY_NAME
COUNTRY CLUB BLVD/295950
STREET_NUMBER
1876
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12319101
CURRENT_STATUS
01
SITE_LOCATION
1876 COUNTRY CLUB BLVD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> ENTRY OBJECTIVIES Install two off site and one onsite cluster groundwater monitoring <br /> wells. Total depth of wells (First water zone - 20 feet below surface and Second water zone 32 <br /> feet below surface) approximately 32 feet below the surface. Offsite monitor wells sited along <br /> the western parking area of Mission Road. Approximately 72 hours after completion of wells, <br /> wells will be developed. Offsite well installations will be provide by a truck mounted drilling <br /> rig utilizing Slnch follow stem augers. Onsite well installations will be provided by a truck <br /> mounted drilling rig utilizing 10inch hollow stem augers <br /> SITE ACTIVITIES: <br /> 1. Set up traffic safety control <br /> 2. Health and Safety tailgate meeting. <br /> 3. Construct soil stockpile area on-site. <br /> 4. Drill and install cluster wells MW6 and MW7. <br /> 5. Drill and install cluster well RE <br /> 6. Clean site. <br /> 7. Cover excavated soils with plastic liner. <br /> JOB HAZARD ANALYSES <br /> PHYSICAL HAZARDS <br /> • X NOISE X TRAFFIC <br /> X UNDERGROUND HAZARDS OVERHEAD HAZARDS <br /> _EXCAVATIONS/TRENCHES TMECHANICAIL EQUIPMENT <br /> %OTHER_gasoline range hydrocarbon vapors_ <br /> ]LEVET, OF PROTECTIVE EQUIPMENT <br /> _A _B _C X D <br /> PERSONAL PRO'T'ECTIVE EQUIPMENT <br /> R= REQUIRED A. =AS NEEDED <br /> R HARD HAT R SAFETY EYEWEAR (TYPE)SAFETY GLASSES <br /> R SAFETY BOOTS —RESPIRATOR(TYPE) <br /> R ORANGE VEST _FILTER (TYPE) <br /> R HEARING PROTECTION R GLOVES (TYPES)NYTRIL INNER GLOOVE <br /> LEATHER OUTER GLOOVE <br /> A TYVEK COVERALLS _OTHER <br /> 5 MIN ESCAPE RESPIRATOR <br /> • <br /> ZSANCHEZ DRILLING- HEALTH/SAFETY <br />
The URL can be used to link to this page
Your browser does not support the video tag.