My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0006092
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1876
>
2900 - Site Mitigation Program
>
PR0542421
>
ARCHIVED REPORTS XR0006092
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2019 1:16:31 PM
Creation date
6/21/2019 10:26:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006092
RECORD_ID
PR0542421
PE
2950
FACILITY_ID
FA0024377
FACILITY_NAME
COUNTRY CLUB BLVD/295950
STREET_NUMBER
1876
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12319101
CURRENT_STATUS
01
SITE_LOCATION
1876 COUNTRY CLUB BLVD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRAFFIC SAFETY PLAN <br /> Well Installation MW6 and MW7 <br /> Shoulder Mission Road <br /> Using a truck mounted drilling rig with 8" hollow stem augers drill to 10 feet below the <br /> surface, continuous core from 10 feet to top of sand. Drill to 18 feet below the surface, <br /> continuous core from 18 feet to top of clay. Install well in first water zone. Move three feet <br /> south. Drill to 23 feet below the surface, continuous core from 23 feet to top of sand. Drill to <br /> 27 feet below the surface, continuous core from 27 feet to top of clay. Install well in second <br /> water zone. Delineating cones will be used to cordon off the work area. See Cal Trans figure 5- <br /> 22, included. The advance warning sign will be positioned 200 feet prior to the intersection of <br /> Mission Road and Country Club Blvd., along the western shoulder south bound lane of <br /> Mission Road. The Taper will commence at the southwest corner of the intersection of Mission <br /> Road and Country Club Blvd. The taper will consist of delineators spaced at 5-foot offset and <br /> will be 15 feet long. A buffer zone will consist of a work truck inside of delineators at 15 feet <br /> 1 prior to work zone. Delineators will be positioned between the work zoVe (drilling rig) and <br /> J traffic. s <br /> J <br /> • <br /> BSANCHEZ DRILLING-HEALTH/SAFETY <br />
The URL can be used to link to this page
Your browser does not support the video tag.