Laserfiche WebLink
5A GROUNDWATER HYDROCARBON PLUME A ZONE <br /> 5B GROUNDWATER HYDROCARBON PLUME B ZONE <br /> 6A GROUNDWATER MTBE PLUME A ZONE <br /> 6B GROUNDWATER MTBE PLUME B ZONE <br /> 7A SOIL TPHg EXTENT I0-12 FEET BELOW GROUND SURFACE <br /> 7B SOIL TPHg EXTENT 14-16 FEET BELOW GROUND SURFACE <br /> 7C SOIL TPHg EXTENT 19-22 FEET BELOW GROUND SURFACE <br /> 7D SOIL TPHg EXTENT 22-26 FEET BELOW GROUND SURFACE <br /> 7E SOIL TPHg EXTENT 28-30 FEET BELOW GROUND SURFACE <br /> 8 LITHOLOGIC CROSS SECTION WITH SOIL TPHg EXTENT <br /> 9 LITHOLOGIC CROSS SECTION WITH A AND B ZONE WATER TPHg <br /> EXTENT <br /> 10 ANTICIPATED AREA TO BE EXCAVATED <br /> 1 I CROSS SECTION VIEW OF AREA TO BE EXCAVATED <br /> APPENDICIES <br /> A WELL INSTALLATION PERMITS <br /> B LAND SURVEYOR REPORT <br /> C BOREHOLE AND WELL CONSTRUCTION LOGS <br /> D WELL DEVELOPMENT FIELD NOTES <br /> E APRIL 18, 2001 QUARTERLY MONITORING FIELD NOTES WITH QA/QC <br /> F DHS CERTIFIED LABORATORY REPORTS s <br /> G "GEOPROBE" AND MONITOR WELL CONSTRUCTION FIELD NOTES <br /> H OVER-EXCAVATION AND AERATION PILE ESTIMATED OUTLINE AND <br /> AMOUNTS <br /> I HEALTH AND SAFETY PLANS FOR "Geoprobe " and Well drilling <br /> J PUMP TEST PROCEDURES <br /> s <br /> 3 Sanchez 2nd QM 2001 <br />