My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0006092
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1876
>
2900 - Site Mitigation Program
>
PR0542421
>
ARCHIVED REPORTS XR0006092
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2019 1:16:31 PM
Creation date
6/21/2019 10:26:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006092
RECORD_ID
PR0542421
PE
2950
FACILITY_ID
FA0024377
FACILITY_NAME
COUNTRY CLUB BLVD/295950
STREET_NUMBER
1876
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12319101
CURRENT_STATUS
01
SITE_LOCATION
1876 COUNTRY CLUB BLVD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S P E C I A L P R O V I S I O N S <br /> Winter Weather Utility Work <br /> • <br /> �.. SUPERVISION: The utility company (permittee) shall furnish <br /> ul -tsme supervision of all work to insure full compliance <br /> with the permit provisions . <br /> 2. START OF WORK: No work within the County right of way shall <br /> e starts until the utility company representative has made <br /> an evaluation of weather conditions and* his determined the <br /> work can be accomplished tinder the provisions of the permit, <br /> 3. CLEAN PAVEMENT: Dirt and mud shall not be deposited on the <br /> pavement outside the area of work, and if inadvertently track- <br /> ed onto the road travelway shall be removed immediately. <br /> 4. DAILY RESTORATION: Private driveways and road intersections <br /> Bhall be res-t-6-r—eff daily. <br /> S. WEATHER--TIGHT CONDITION: All trenches shall be filled and <br /> compacts , 21itche_s__a_n27other drainage facilities regraded <br /> and opened, and the entire work area restored to weather- <br /> tight condition prior to any rain° <br /> a <br /> r <br /> r <br /> r <br /> • <br /> Engineering Form 1 <br /> 5/79 <br />
The URL can be used to link to this page
Your browser does not support the video tag.