Laserfiche WebLink
WEGE WELL CONSTRUCTION LOG <br /> SANCHEZ PZ2�' <br /> PROJECT NAME MONITOR WELL NUMBER <br /> 1876 Country Club Blvd , Stockton TOP OF CASING ELEVATION 3.29 <br /> PROJECTNUMBER DATECOMPLETED JANUARY7,2003 <br /> WELLTYPE PIEZOMETER <br /> REMARKS: WELL INSTALLED THROUGH 8 INCH HOLLOW STEM AUGERED <br /> BORING <br /> TYPICAL MONITORING <br /> WELL <br /> 71 WELL CONSTRUCTION <br /> 1 Total Depthof hole '89( T <br /> 2 Diameterof boring BINCH <br /> 5 <br /> s 3 Casing length I9 FEEg <br /> 4 <br /> 4 Diameterof casing 21NCH <br /> 5 Depth to top of screen 14 FEET <br /> 6 Length of screen <br /> 9_ 5 FEET <br /> screen interval 14'-19.0' <br /> screen type MONOFLEX F480 <br /> screen size 0.010INCH <br /> 3 <br /> 7 Surface seal 8"TRAFFICBOX <br /> seal material CONCRETE <br /> 11 6 8 Backfill 616-9' <br /> seal material NEATCEMENT <br /> 9 Upperseal 9'- 12.5➢ <br /> seal material BENTONITE <br /> 10 Lower seal <br /> seal material <br /> 2 11 Annulus 12.5'- 19' <br /> materia #2112 SAND <br /> NOTE Well constructed with poly vinyl chloride(PVC) <br /> castngwith threaded bottom cap and slip on top cap <br /> Also,PVC steam cleaned before constructing each well <br /> Traffic boxes are water tight and locked for security <br />