Laserfiche WebLink
SPECIAL PROVISIONS <br /> Winter Weather Utility Work <br /> 1 SUPERVISION: The utility company (permittee) shall furnish full-time supervision <br /> of all work to insure full compliance with the permit provisions <br /> 2 START OF WORD No work within the County right-of--way shall be started until the <br /> utility company representative has made an evaluation of weather conditions and <br /> has determined the work can be accomplished under the provisions of the permit <br /> 3 CLEAN PAVEMENT:: Dirt and mud shall not be deposited on the pavement <br /> outside the area of work, and if inadvertently tracked onto the road travel way shall <br /> be removed immediately <br /> 4 12AILY RESTORATION: Private driveways and road intersections shall be restored <br /> daily <br /> 5 WEATHER TIGHT CONDITION: All trenches shall be filled and compacted, <br /> ditches and other drainage facilities regraded and opened, and the entire work area <br /> restored to weather-tight condition prior to any rain. <br />