Laserfiche WebLink
WEGE WELL CONSTRUCTION LOG <br /> SANCHEZ <br /> PROJECT NAME MONITOR WELL NUMBER MW8-1 <br /> 1879 Count Club Bivd , Stockton <br /> TOP OF CASING ELEVATION <br /> PROJECTNUMBER DATECOMPLETED J_une23. 2004 <br /> WELLTYPE GROUNDWATER MONITORING WELL <br /> REMARKS. WELL INSTALLED THROUGH 8 INCH HOLLOW STEM AUGERED <br /> BORING — <br /> TYPICAL MONITORING <br /> WELL <br /> 7 -- ---- WELL CONSTRUCTION <br /> - I Total Depth of hole 30FTB�IN <br /> 2 Diameterof borin CH <br /> 5 4 8 3 Casing lengt 28 FEET <br /> 4 Diameterof casin 2- INCH <br /> ___-___j 5 Depth to top of screen 22.5 F <br /> Io 6 Length of screen 5 FEEL <br /> screen interval 22.5'-27.: <br /> °� tw screen type MONOFLEX F48C <br /> screen size 0.020INCF <br /> 7 Surfaceseal 8"TRAFFICBOX <br /> 5 sea[ irmaterla�CONCRETE <br /> S Backfin 6"-20' <br /> seal materia! NEATCEMENT <br /> 9 Upperseal 20'- 22' <br /> sea! materia! BENTONITE <br /> - 10 Lower seal <br /> seal material <br /> 2 <br /> 11 Annulus 22'- 30' <br /> material #3 SAND <br /> NOTE Well constructed with poly vinyl chloride(PVC) <br /> 0 casing with threaded bottom cap and slip on top cap <br /> Also, PVC steam cleaned before constructing each well <br /> Traffic boxes are water tight and locked for security <br />