My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2103
>
3500 - Local Oversight Program
>
PR0544591
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2019 2:38:17 PM
Creation date
6/21/2019 11:32:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0544591
PE
3526
FACILITY_ID
FA0005220
FACILITY_NAME
CHEVRON #9-4054
STREET_NUMBER
2103
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12308029
CURRENT_STATUS
02
SITE_LOCATION
2103 COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pug U'2 '9z' / 1b!7! nio .uor P.o��' <br /> f ' <br /> costs which do not exceed $150, 000.00, which apeeifieallY <br /> excludes any cost incurred by Berberian or Craig prior to d- <br /> Auguat 24, 1992 to remediate the site to a level as may be <br /> required by the RWQCB Or its designated agency. CHEVRON <br /> agrees to accept responsibility for 50% of all assessment <br /> and remediation costs which do not exceed $160,000.00, which <br /> specifically excludes any costs incurred by OHmox prior <br /> nugust 24, 1093, to remediate the Rite to a level as may be <br /> required by the REQCB or its designated agency. CHEVRON <br /> further agrees to accept responsibility for 100% of all <br /> acsesament and remediation costs exceeding 9150,000.00, to <br /> remediate the site to a level as may be required by the <br /> RWQCB or its designated agency. <br /> 4.2 CHEVRON shall not be responsible for damages or costs of <br /> cleaning up or removal and remediation of any groundwater <br /> contamination found at the YORMER SERVICE STATION SITE, <br /> which occurs after transfer of title to any third party to <br /> this Agreement, or which occurs after submission of <br /> CHEVRON's final report in accordance with paragraphs 3.1 and <br /> 3 .5 herein to the RWQCB, or its designated agency. <br /> 4.3 oREVRON shall provide to the BERBERIANB and CRAIG a copy of <br /> its consulting invoices each month documenting in reasonable <br /> detail the costs incurred in connection with the <br /> investigation and remediation of the site. Within thirty <br /> (3o) days aftor receipt of an invoice, the BERBERIANS and <br />
The URL can be used to link to this page
Your browser does not support the video tag.