My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2103
>
3500 - Local Oversight Program
>
PR0544591
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2019 2:38:17 PM
Creation date
6/21/2019 11:32:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0544591
PE
3526
FACILITY_ID
FA0005220
FACILITY_NAME
CHEVRON #9-4054
STREET_NUMBER
2103
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12308029
CURRENT_STATUS
02
SITE_LOCATION
2103 COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chevron <br /> Chevron <br /> Chevron Products Company <br /> March 18, 1999 6001 Bollinger Canyon Road <br /> Building L <br /> San Ramon,CA 94583 <br /> P.O.Box 6004 <br /> San Ramon,CA 94583-0904 <br /> Mr.Ron Berberian <br /> 2021 W.March Lane, Suite 2A Marketing-Sales West <br /> Stockton,CA 95207 Phone 510 842-9500 <br /> Mr.Patrick Craig <br /> 721 N.Union Street <br /> Stockton,CA 95205 <br /> Re: Former Chevron Station#94054 2103 Country Club Blvd Stockton,CA <br /> Gentlemen: <br /> As I'm sure you are aware Chevron has received approval to implement remediation activities at the subject <br /> site according to the Remediation Work Plan that was prepared by Terra Vac on October 20, 1994.The <br /> remediation plan is an aggressive in-situ approach that should achieve water quality goals in a relatively <br /> short period of time(see updated schedule below). <br /> We are proceeding with the remediation plan according to your representation on July 7, 1997 that <br /> subsequent site development plans will not involve extensive excavation.As such,we would not anticipate <br /> additional soil and/or water handling costs beyond those possibly encountered during typical slab on grade <br /> construction activities(i.e.,utility trenching).Please notify me as soon as possible if your property <br /> development plans are different from that described above. <br /> March, 1999 Air Permit Application <br /> March, 1999 Water Discharge Permit <br /> March-April, 1999 Well Permits <br /> May, 1999 Utility Connection <br /> June, 1999 Remediation System Start-Up <br /> September, 1999 Interim borings/well <br /> January,2000 Management Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.