My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2103
>
3500 - Local Oversight Program
>
PR0544591
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2019 2:38:17 PM
Creation date
6/21/2019 11:32:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0544591
PE
3526
FACILITY_ID
FA0005220
FACILITY_NAME
CHEVRON #9-4054
STREET_NUMBER
2103
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12308029
CURRENT_STATUS
02
SITE_LOCATION
2103 COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Brett Hunter <br /> Chevron Products Company - 2 - February 8, 1999 <br /> Task Amount Pre-Approved Comments <br /> Task 2: Engineering,Permitting,and $9,919 <br /> Reporting <br /> Task 3: Remedial System Installation $86,068 <br /> (includes the drilling of 20 remediation <br /> wells to an approximate depth of 30 feet <br /> bgs each,construction,mobilization, <br /> and one week of start-up/testing) <br /> Task 4:Operation&Maintenance $ 71,970 The operation&maintenance weekly <br /> (includes thirty weeks of equipment personnel labor hours for the technician and <br /> rental,operation&maintenance, project manager were reduced to four and one, <br /> utilities,and analytical costs:twenty and respectively. Additional time spent needs to be <br /> ten weeks using a thermal oxidizer and justified through appropriate documentation <br /> activated carbon,respectively) (i.e.narrative, field records,etc.),provided <br /> with the corresponding reimbursement request. <br /> Task 5: Interim System Performance $ 12,359 <br /> Evaluation(includes 3 remediation wells <br /> to 30 feet bgs,analytical,associated <br /> remediation construction,and reporting <br /> activities) <br /> Task 6: Closure Activities, $0 This task should be pre-approved by Fund staff <br /> Demobilization,and Final Report I at a later date.2 <br /> TOTAL PRE-APPROVED $ 184,511 <br /> Reimbursement of the pre-approved costs is also contingent upon the following items. <br /> • The actual costs and scope of work performed must be consistent with the pre-approval for it to <br /> remain valid. <br /> • The work products must be acceptable to the PHS-EHD. <br /> • If a different scope of work becomes necessary,then you must request pre-approval of costs on the <br /> new scope of work. <br /> 2 It should be noted that only thirty weeks of remedial operation are pre-approved at this time. After completion of <br /> thirty weeks of operation,please submit a formal Cost Pre-Approval Request to the Fund(including all related <br /> technical reports,status reports,and regulatory correspondence)for closure activities or additional remediation <br /> activities,as appropriate. <br /> California Environmental Protection Agency <br /> �a Rec)rled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.