Brett Hunter <br /> Chevron Products Company - 2 - February 8, 1999 <br /> Task Amount Pre-Approved Comments <br /> Task 2: Engineering,Permitting,and $9,919 <br /> Reporting <br /> Task 3: Remedial System Installation $86,068 <br /> (includes the drilling of 20 remediation <br /> wells to an approximate depth of 30 feet <br /> bgs each,construction,mobilization, <br /> and one week of start-up/testing) <br /> Task 4:Operation&Maintenance $ 71,970 The operation&maintenance weekly <br /> (includes thirty weeks of equipment personnel labor hours for the technician and <br /> rental,operation&maintenance, project manager were reduced to four and one, <br /> utilities,and analytical costs:twenty and respectively. Additional time spent needs to be <br /> ten weeks using a thermal oxidizer and justified through appropriate documentation <br /> activated carbon,respectively) (i.e.narrative, field records,etc.),provided <br /> with the corresponding reimbursement request. <br /> Task 5: Interim System Performance $ 12,359 <br /> Evaluation(includes 3 remediation wells <br /> to 30 feet bgs,analytical,associated <br /> remediation construction,and reporting <br /> activities) <br /> Task 6: Closure Activities, $0 This task should be pre-approved by Fund staff <br /> Demobilization,and Final Report I at a later date.2 <br /> TOTAL PRE-APPROVED $ 184,511 <br /> Reimbursement of the pre-approved costs is also contingent upon the following items. <br /> • The actual costs and scope of work performed must be consistent with the pre-approval for it to <br /> remain valid. <br /> • The work products must be acceptable to the PHS-EHD. <br /> • If a different scope of work becomes necessary,then you must request pre-approval of costs on the <br /> new scope of work. <br /> 2 It should be noted that only thirty weeks of remedial operation are pre-approved at this time. After completion of <br /> thirty weeks of operation,please submit a formal Cost Pre-Approval Request to the Fund(including all related <br /> technical reports,status reports,and regulatory correspondence)for closure activities or additional remediation <br /> activities,as appropriate. <br /> California Environmental Protection Agency <br /> �a Rec)rled Paper <br />