My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2103
>
3500 - Local Oversight Program
>
PR0544591
>
SITE INFORMATION AND CORRESPONDENCE FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2019 7:17:12 PM
Creation date
6/21/2019 11:37:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0544591
PE
3526
FACILITY_ID
FA0005220
FACILITY_NAME
CHEVRON #9-4054
STREET_NUMBER
2103
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12308029
CURRENT_STATUS
02
SITE_LOCATION
2103 COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date: January 23,2001 SECOR <br /> International Incorporated <br /> CHEVRON QUARTERLY GROUNDWATER MONITORING REPORT (3Q2000) <br /> Primary Agency: Mike Infurna <br /> San Joaquin County <br /> Environmental Health Division <br /> 304 East Weber Avenue,Third Floor <br /> Stockton,CA 95202 <br /> Facility No.: 9-4054 Address: 2103 Country Club Boulevard,Stockton,California <br /> CHEVRON Project Manager: Robert Cochran <br /> Consulting Co./Contact Person: SECOR International,Inc. —Roger Hoffmore <br /> Consultant Project No.: 077.41991.030 <br /> Assembly Bill 681 Status: Property Owner: Ronald Berberian,Patrick Craig <br /> and Joan McNabb <br /> WORK PERFORMED THIS QUARTER: Third Quarter—2000: <br /> 1. Conducted quarterly groundwater monitoring and sampling. <br /> 2. Prepared and submitted groundwater monitoring report. <br /> 3. Initiated remedial system installation(DVE). <br /> WORK PROPOSED FOR NEXT QUARTER: Fourth Quarter - 2000: <br /> 1. Conduct quarterly groundwater monitoring and sampling. <br /> 2. Prepare and submit groundwater monitoring report. <br /> 3. TerraVac remedial system installation(DVE)and startup. <br /> QUARTERLY RESULTS SUMMARY: <br /> Current Phase of Project: Monitoring and Sampling <br /> Frequency of Groundwater Sampling: Quarterly <br /> Frequency of Groundwater Monitoring: Quarterly <br /> Is Free Product(FP)Present On-Site: No <br /> Current Remediation Techniques: Dual Vacuum Extraction(DVE) <br /> Approximate Depth to Groundwater: 9 to 10 feet <br /> Groundwater Gradient: Northwest to Northeast @ 0.001 filft <br /> 3017 Kilgore Road, Suite 100, Rancho Cordova, CA 95670 916.861.0400 916.861.0430 Fax unaw.secoccom <br /> l <br />
The URL can be used to link to this page
Your browser does not support the video tag.