My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2103
>
3500 - Local Oversight Program
>
PR0544591
>
SITE INFORMATION AND CORRESPONDENCE FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2019 7:17:12 PM
Creation date
6/21/2019 11:37:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0544591
PE
3526
FACILITY_ID
FA0005220
FACILITY_NAME
CHEVRON #9-4054
STREET_NUMBER
2103
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12308029
CURRENT_STATUS
02
SITE_LOCATION
2103 COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AWO <br /> t"TEFRKRA <br /> 9 VAC <br /> ^ 5075 Commercial Circle Suite A, Concord, CA 94520 <br /> [� Tel: (925) 363-7322 ❑ Fax: (925) 363-7275 <br /> December 2, 1999 DEC - 6 1999 <br /> ENVIRONMENTAL HEALTH <br /> Mike Inferno <br /> PHS-EHD PERMIT/SERVICES <br /> 304 E. Weber,3rd Floor <br /> Stockton,CA 95202 <br /> Subject: Well Permit Application <br /> Former Chevron Station 9-4054 <br /> 2103 Country Club Boulevard <br /> Stockton,CA <br /> Dear Mr. Inferna: <br /> Please find attached a well permit application,and accompanying fees,for the installation of 16 dual vapor <br /> extraction wells and 6 air injection wells at the above site. Because the depth to water table is now less <br /> than 15 feet,we will be utilizing dual phase extraction to target the hydrocarbon impacted soils located at <br /> F10-20 feet bgs. The DVE pilot test,conducted on existing monitoring wells screened into the more <br /> rtn le sand below 20 feet,showed that dewatering at this depth would not be effective with DVE. As <br /> Qper UCUUVU Action Plan,two-inch sparge wells will be installed to about 30 feet,with two feet of <br /> Z screen. The DVE wells will be 4-inch wells,screened from approximately 10 to 20 feet. The DVE wells <br /> will capture any offgas that may be generated,as well as remediating the shallower zone,and the elevated <br /> IL oxygen levels will enhance biodegradation. <br /> The accompanying figure shows the general layout of the wells. Since the wells are relatively close to each <br /> other,and are of similar depth and construction,sampling for lithology will be conducted on up to ten of <br /> the wells only. Soil samples with the highest PID reading from each of the ten wells logged,will be <br /> analyzed for TPHg/BTEX. <br /> If you have any questions,please call me at(952)363-7322. <br /> Sincerely, <br /> " �'kc-4K <br /> Robert A.Dahl <br /> Project Manager <br /> file 30-0212.16.05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.