My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2103
>
3500 - Local Oversight Program
>
PR0544591
>
WORK PLANS FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2019 7:22:35 PM
Creation date
6/21/2019 11:39:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 2
RECORD_ID
PR0544591
PE
3526
FACILITY_ID
FA0005220
FACILITY_NAME
CHEVRON #9-4054
STREET_NUMBER
2103
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12308029
CURRENT_STATUS
02
SITE_LOCATION
2103 COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c� <br /> NO <br /> Table of Figures <br /> Figure 1. Angered, permanent multilevel soil vapor sampling probe(by Chuck Zuspan, <br /> CVXETC)...................................................................................................................7 <br /> Figure 2. Direct-push soil vapor sampling probe(implant type; Geoprobe®)...................9 <br /> Figure 3. Direct-push soil vapor sampling probe(Post Run Tubing System,PRT; <br /> Geoprobe1)............................................................................................................... 11 <br /> Figure 4. Drilling through a slab(left),and inner and outer holes(right;EPA). ............ 13 <br /> Figure 5. General schematic of sub-slab vapor probe(EPA).......................................... 13 <br /> Figure 6. Stainless steel sub-slab vapor probe components(EPA). ................................ 13 <br /> Figure 7. Completed sub-slab vapor probe (EPA)........................................................... 14 <br /> Figure 8. Schematic illustration of sub-slab vapor sampling probes in a basement(EPA). <br /> ................................................................................................................................... 14 <br /> Figure 9. Swagelok®connectors(image from equipsales.com)...................................... 15 <br /> Figure 10. 6 L Summa canister(image from Air Toxics Ltd.)...................................... 16 <br /> Figure 11. Equipment arrangement for soil vapor purging and sampling(by Chuck <br /> Zuspan, CVX ETC)...................................................................................................20 <br /> Figure 12. Range of flow rates for given sampling time intervals using the Air Toxics <br /> Ltd. Flow controller(from Air Toxics Ltd.)..............................................................21 <br /> Figure 13. Depth profile of benzene, 02,and CO2(by Chuck Zuspan,CVX ETC)........24 <br /> ETC Soil Vapor Sampling Technical Toolkit 3 <br /> Version 1.4,September 7, 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.