My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS FILE 3
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2103
>
3500 - Local Oversight Program
>
PR0544591
>
FIELD DOCUMENTS FILE 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2019 2:57:24 PM
Creation date
6/21/2019 11:54:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
FIELD DOCUMENTS
FileName_PostFix
FILE 3
RECORD_ID
PR0544591
PE
3526
FACILITY_ID
FA0005220
FACILITY_NAME
CHEVRON #9-4054
STREET_NUMBER
2103
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12308029
CURRENT_STATUS
02
SITE_LOCATION
2103 COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r CHEVRON #9-4054 Page 1 of 1 <br /> Ib/ <br /> i/ Path to Closure PlanGo <br /> — _ v � GEOTRACKER HOME I MANAGE PROJECTS I REPORTSSEARCHLOGOUT <br /> CHEVRON #94064 (70607700063) - MAP THIS SITE OPEN- SITEASSESSMENT <br /> 2103 COUNTRY CLUB BLVD CLEANUPOVERSIGHTAGENCIES <br /> STOCKTON , CA 96204 ACTIVITIES REPORT BAN JOAQUIN COUNTY LCP (LEAD) - CASE* 1760 <br /> CASEWORKER: ANGELICA SANDOVAL MAR IN - SUPERVISOR:ADRIENNEELLSAESSER <br /> SAN JOAQUIN COUNTY PUBLIC WEBPAGE CENIRALVALLEY RWQCB (REGION 5S) - CASE#' 390069 <br /> VIEW PRINrABLE CASE SUMMARY FOR THIS SITE CASEWORKER: JAMESRARTON - SUPERVIS02 CORI CONDON <br /> CUP Glenn #: 12729, 3974 CUP Priority Assigned: D CUP Amount Paid: Sit <br /> THIS PROJECT WAS LAST MODIFIED BY NOEL UOQERS09ON 11/221201311:48:24 AM - ISSV <br /> THIS SITE HAS UNAPPROVED SUBMITTALS. CLICK H969 TO OPEN NEW WINDOW WITH THE SUBMITTAL APPROVAL PAGE FOR THIS SIZE. <br /> Path to Closure Plan - FY 12/13 THIS VERSION fS FINAL AS OF 11/22/2013 PATH TO CLOSURE HISTORY CLEAR I RESET PATH TO CLOSURE PLAN <br /> IMPEDIMENT 1 : <br /> FGeneral Criteria E: An eptual site model that assesses the nature, extent, and mobility of the release rl Procedural Impetllment - Ixro <br /> NOT been developed <br /> Step to Resolve Impediment 1 - Stop. 1 : - DELETE STEP <br /> COMPLETION DATE <br /> Review o a reports, <br /> .nary 2U13, finds the elements of a c p p me <br /> or referenced in other p , o this criteria lisTsatis£ietl. DDATE <br /> Rom3012014 _. ACTUAL WlWM13TE <br /> ADDADDITIONALSTEP <br /> IMPEDIMENT 2: <br /> General Criteria F: Secondary source has NOT been removed to the extent practicable r Procedural Impediment - wro <br /> Step to Resolve Impediment2 - Step 1 : - DELETE STEP <br /> lares <br /> approved remedial s reduce benzene cone 1benzene- COMPLETION GATE <br /> I lever <br /> G7 <br /> rperatice <br /> e addressed mos ' impacted 15-25 feet bsglas MW during nee PROJEC r�ACTUAL <br /> was 9-11 feet. not have &302015 AT I <br /> ADD ADDITIONAL STEP <br /> IMPEDIMENT 3: <br /> Media-Soecific Criteria: Groundwater: The contaminant plume that exceeds water quality objectives is F r Procedural Impediment - INFO <br /> NOT stable or decreasing in areal extent, and does NOT meet all of the additional characteristics of one of <br /> the five classes of sites. <br /> Conditions that do not meet the policy criteria: <br /> • Plume Length (That Exceeds Water Quality Objectives): t 260 Feet and < 1,000 Feet <br /> • Plume is Stable or Decreasing in AREAL Extent: Unknown <br /> • Free Product in Groundwater: No <br /> • Benzene Concentration: >_ 11000 pg/1 and < 35000 pgll <br /> • Nearest Surface Water Body (From Plume Boundary): Unknown <br /> Step to Resolve Impediment 3 - Step is -DELETE STEP <br /> Submit work plan to complete delineation of impacted groundwater north and northwest. COMPLETION DATE <br /> J <br /> AM 2J ACTUALDATE <br /> ROW014F--- I <br /> Step to Resolve Impediment 3 - Step 2: - DELETE STEP <br /> xe field work and submit report of findings COMPLETION DATE <br /> PROJECTED DATE ACTUAL DATE&2E12m4 J <br />- - Step to Resolve impediment 3 - Step 3: - DELEWSTEP - <br /> Implement a _ remedial actions e n ons o pass a benzene-related <br /> t bWP COMPLETION OR <br /> criteria. Previous vPe may not have addressed most impacted soil 15-25 fee[ bsg as vaWduringtheOPE PROJECTED GAE ACIagL OgTE <br /> operation was 9-11 feet . G/3N2015 <br /> - - - ADD ADDITIONAL STEP - - - - <br /> REQUIREMENTS ALONG PATH TO CLOSURE <br /> PUBLIC WELL <br /> DATEMENTIFIED RPNOTIFCATION PARTICIPATION DESTRUCTION WASTE DISPOSAL LAND SITE CLOSURE <br /> FORCLOSURP CLOSURE INITIATEDBY DATE COMPLETION DALE DATE DATE RESTRICTION DATE DATE <br /> F� SANJOAOUIN COUNTY LOP I I I II FF� <br /> Date IJenified for Closure is the date all Impediments to closure have been removed <br /> Save in Progress Save as Final <br /> LOGGED IN AS HENDERSONN CONTACT GEOTRACKER HELP <br /> https://geotracker.waterboards.ca.gov/regulators/screens/closure—Policy.asp?global_id=T. . . 11 /22/2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.