My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2151
>
3500 - Local Oversight Program
>
PR0544592
>
WORK PLANS FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2019 3:29:18 PM
Creation date
6/21/2019 1:14:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0544592
PE
3526
FACILITY_ID
FA0009449
FACILITY_NAME
COUNTRY CLUB TIRES AND MUFFLER
STREET_NUMBER
2151
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12308030
CURRENT_STATUS
02
SITE_LOCATION
2151 W COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15 January 2007 <br /> AGE-NC Project No. 99-0669 <br /> Page 8 of 10 <br /> 3.1.3.1. Static water level measurements <br /> Before purging and sampling during ground water monitoring events, static water level will be <br /> measured using an electric water level indicator.Water level data will be recorded to the nearest 0.01 <br /> foot from a reference point marked of the top of the PVC well casing. Before and after each use,the <br /> electric oil/water level indicator will be washed in an Alconox solution and rinsed with water. <br /> 3.1.3.2. Well evacuation <br /> Subsequent to measurement of depth to water and prior to sampling,the well will be purged utilizing <br /> either a submersible pump,inertia pump or by hand bailing to ensure that the ground water sample <br /> is representative of the formation, rather than water standing in the well casing. The well will be <br /> purged until: 1) a minimum of three casing volumes is removed from the well; and/or 2) the <br /> field-measured ground water parameters pH,temperature and electrical conductivity have stabilized. <br /> However, if a well is purged dry prior to evacuating three casing volumes, a ground water sample <br /> will be collected following 80 percent recovery of ground water level within the well or within <br /> 8-hours of well evacuation. <br /> Purge water and decontamination water generated during the ground water sampling activities will <br /> be contained in DOT-approved drums which will be appropriately labeled for storage. Drums <br /> containing purge water will be stored on-site pending appropriate removal and disposal. <br /> 3.1.3.3. Sample withdrawal <br /> Water samples will be collected from the monitoring well using a disposable polyethylene bailer or <br /> a dedicated teflon tubing used in conjunction with an inertia pump.The bailers are disposed of after <br /> one use and require no decontaminating and the teflon tubing used with the inertia pump is either <br /> dedicated to each well or changed at each sampling event,thereby minimizing cross contamination <br /> due to sampling devices. Samples will be drawn and collected in such a manner that agitation and <br /> exposure of the ground water to the atmosphere are minimal. <br /> 3.1.3.4. Sample handling <br /> Ground water samples will be collected into laboratory supplied containers.Ground water samples <br /> to be analyzed for TPH-g,BTEX,oxygenated compounds(MTBE,TAME,ETBE,DIPE and TBA) <br /> and fuel additives (1,2-DCA and EDB) will be collected into 40-milliliter (ml) volatile organic <br /> analysis (VOA) vials. Following collection, the samples will be placed on ice and kept in a cooler <br /> Advanced GeoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.