My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2151
>
3500 - Local Oversight Program
>
PR0544592
>
WORK PLANS FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2019 3:29:18 PM
Creation date
6/21/2019 1:14:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0544592
PE
3526
FACILITY_ID
FA0009449
FACILITY_NAME
COUNTRY CLUB TIRES AND MUFFLER
STREET_NUMBER
2151
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12308030
CURRENT_STATUS
02
SITE_LOCATION
2151 W COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring Well Installation and Soil Vapor Investigation Work Plan <br /> BOULEVARD AUTOMOTIVE SERVICE <br /> 2151 Country Club Boulevard,Stockton,California <br /> TABLE OF CONTENTS <br /> SECTION PAGE <br /> 1.0. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . .. .. . . .... . . . ... 1 <br /> 2.0. SCOPE OF WORK . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . .... . . ..... . ... . 1 <br /> 2.1. PERMITTING AND PRE-FIELD WORK PREPARATIONS . . . . . . . . . . . . . . . 2 <br /> 2.2. WELL DRILLING AND SOIL SAMPLE COLLECTION . . . . . . . . . . . . . . . . . . 2 <br /> 2.3. WELL DEVELOPMENT AND SURVEY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 <br /> 2.4. GROUND WATER SAMPLE COLLECTION AND ANALYSIS . . . . . . . . . . . 4 <br /> 2.5. PROBING AND COLLECTION OF SOIL Vapor SAMPLES . . . . . . . . . . . . . . . 5 <br /> 2.6. REPORT PREPARATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 <br /> 3.0. FIELD PROCEDURES . . . .. . . . . . . . . . . . . . . . . . . . .. . . . . ... . . ... . . . . . .. . . . . . 6 <br /> 3.1. WELL DRILLING AND SAMPLING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 <br /> 3.1.1. Well Completion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 <br /> 3.1.2. Well Development . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 <br /> 3.1.3. Ground Water Sampling Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 <br /> 3.1.3.1. Static water level measurements . . . . . . . . . . . . . . . . . . . . 8 <br /> 3.1.3.2. Well evacuation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 <br /> 3.1.3.3. Sample withdrawal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 <br /> 3.1.3.4. Sample handling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 <br /> 3.2. SOIL VAPOR INVESTIGATION PROBE BORING ADVANCEMENT . . . . . . 9 <br /> 3.2.1. Collection Of Soil Vapor Samples . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 <br /> 3.2.2. Equipment Decontamination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 <br /> 3.2.3. Boring Abandonment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 <br /> FIGURES <br /> Figure 1 -Location Map <br /> Figure 2 -Site Plan <br /> Figure 3 -Proposed Monitoring Well Design -Hydrological Unit 2 <br /> Figure 4 -Proposed Monitoring Well Design -Hydrological Unit 4 <br /> APPENDICES <br /> Appendix A - SICEHD Directive Letter- 03 January 2007 <br /> Advanced GeoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.