Laserfiche WebLink
r I I <br /> Job Representative Signature:Job Rep sh &a inspect after work is Date: <br /> completed. Job Rep shall sign off eac is P�aye. <br /> c <br /> 10. + r ' • SP Representative to m an both Layout sketch the hole that has been patched <br /> Job Representative Signature:J Re shall visually Inspect after work is Date: <br /> completed. Job Rep shall sign if as In day it acceptable <br /> Foundation Repairs <br /> (ITEM 31 CODE 4) <br /> 1. There is no foundation seal between the external bottom edge projection and the concrete pad foundation, <br /> which allows water to run under the tank. Apply an approved sealant to the gap between the chime and the <br /> concrete pad. <br /> 2. Prior to application of the caulk,the bottom extension(chime)and the concrete surface shall be pressure <br /> washed,cleaned and prepared to provide an adequate bond in accordance with the manufacturer's <br /> recommendations. The bottom extension and the concrete ringwall shall be wire brush cleaned or abrasive <br /> blasted to provide better surface preparation that will promote strong adhesion.The sealant shall be Sherwin <br /> Williams Stampede,other approved sealant. <br /> 3. The ent've perimeter of the tank shall be recaulked and sealed.The gap between the batten extension and <br /> the concrete surface shall be completely sealed to prevent the entry of water under the tank bollen <br /> 4. PIN91191•• The completed work shall be visually inspe ted by a DP representative. <br /> Date: <br /> Job Representative Signature:Job Rep sh v" uall sp at after work is <br /> completed Job Rep shall sign offeach y' ac ab <br /> AN 653 Impactor Signature: raper r sh v rify that the Job Rep has signed Date: <br /> off the above item then Inspector:an si.- off.; <br /> Bottom Patching (Critical Zone) <br /> 1. There is one(1)area of lamination near the critical zone of the bottom plates.This area shall be repaired by <br /> a tombstone shaped patch that will extend into the critical zone to the shell.This area is located in bottom <br /> plate#2;which is marked on the bottom with paint and is shown on the floor plate layout drawing.The pit <br /> depth is 0 145'and the remaining bottom thickness is 0.105'- <br /> 2. An bottom coaling in the repair areas shall be completely removed prior to weld preparation and welding. <br /> 3. • . •• Existing welds to be covered by a new patch plate shall be visually inspected[VT)by a 5P <br /> representative. <br /> Date: <br /> Job Representative Signature:Job Rep shalla!1ht <br /> act after work is <br /> ompleted. Job Rep shall sign off each it if4cJ L �1(� <br /> API 653 Inspector Signature;Inspect sh verify job Rep has signed Daae, <br /> .if the above Item then Inspector c slgnoff. <br />