Laserfiche WebLink
20 October 2011 <br /> AGE-NC Project No. 96-0236 <br /> Page 7 of 7 <br /> should form a dilute solution of hydrogen peroxide/muriatic acid. <br /> 5.2. PROGRESS/CONFIRMATION/COMPLIANCE MONITORING AND SAMPLING <br /> Performance of progress/confirmation sampling will be completed on a weekly basis for <br /> three weeks following completion of the last of four injection events. Progress/confirmation <br /> testing will be performed by an OSHA40-hour certified AGE representative. Monitoring and <br /> sampling will be performed in accordance with AGE's standard monitoring and sampling <br /> procedures (Appendix A). <br /> Field parameters and laboratory samples will be collected from wells MW-1 A, MW-1 B, <br /> MW-2 and DPE-1/DPE-2 and will be monitored and analyzed for the constituents and <br /> parameters listed in Section 4.1. <br /> 5.3. EQUIPMENT DECONTAMINATION <br /> Upon completion of each injection event all equipment will be rinsed and removed of any <br /> oxidant or acid material. All rinseate accumulated during the injection activity will be stored <br /> on-site in an approved DOT container prior to its removal and disposal. <br /> Advanced GeoEnrironmental,Inc. <br />