Laserfiche WebLink
13 January 1998 <br /> AGE-NC Project No. 98-0398 <br /> Page 3 of 6 <br /> Y a►C t� T: Jl+t NCTION: .E 11.S t? `PRt�T CT 4N: <br /> Exclusion Zone Drill borings <br /> F A B C D Other <br /> Reduction Zone Preserve samples A B C D Other <br /> and log borings <br /> Su rt Zone Support functions A B C D Other <br /> Specific protective equipment for each level of protection used is follows: <br /> hard hat <br /> steel-toed boots <br /> Level D: half-faced respirator(if necessary) <br /> gloves <br /> safety glasses <br /> If air purifying respirators are authorized,organic vapor and dust is the appropriate canister for use <br /> with the involved substances and concentrations. No changes of the specified levels of protection <br /> shall be made without the approval of the site safety officer and the project team leader. <br /> 6.0. ON-SITE WORK PLANS <br /> Work party(ies)consisting of two persons will perform the following tasks: <br /> PROJECT TEAM LEADER: TASK: <br /> Timothy Cuellar Over site <br /> FIELD CREW: TASK: <br /> Geo Probe Operator Advance borings <br /> Field Technician if nec. Clean equipment <br /> Advanced GeoEnvironmental,Inc. <br />