Laserfiche WebLink
OW4W <br /> MW-7 4) 0 <br /> Temp. Commercial 3"0 PVC a J <br /> service pole service meter and electrical conduit d <br /> breaker panel Cement Curb Overhead phone line aEi <br /> 61W-4 c5 N <br />` O <br /> Proposed ; O <br /> Groundwater ExtractionW C <br /> — System Enclosure EXPLANATION L <br /> PG&E MW16 ♦ r d <br /> overhead wireA MW2 ♦ Monitoring well location <br /> Propose e MW8 Extraction well location L <br /> Existin \ Below-grade <br /> Above9 rade \ ElecUical C Proposed 5'x8' 0 Detail call-out <br /> MW2 Electrical \ Conduit 3 ` C-Line Container 3 O <br /> Conduit \ i <br /> Trench cross-section <br /> 0000 Abandoned \ 1 MW1 Proposed Remediation Trench 9 <br /> Station Building \ \ Q , (z) 4" DIA scH40PVC Storm drain (SD) <br /> I Proposed \ 111 (1) 3" DIA DR-35 Discharge Pipe <br /> I Splice Box a - — Water supply(2) Y DIA SCH40 PVC <br /> PG&E Pmel I P \ \ \ \ PP Y lw> <br /> Transformer Existing remediation piping <br /> Existing 12'x16' io \ "' A Re-route Existing Pipe <br /> Groundwater Extraction \ , 5 To New Compound — — — — Existing sanitary sewer connection <br /> inactive System Enclosure <br /> " dispenser W Y Existing overhead phone line Q <br /> stands Existing underground electrical <br /> I , \ - - - - - - - - Proposed remediation trench/pipe i m <br /> o MW15 ,�/ �� ProposedRemediatlonTrench - - - - - - - Proposed electrical trench/cenduit <br /> / � Pro(2) 3" DIA SCH40 PVC CHASES W1314" DIA _ 3 <br /> /Existing Remediation TrenchProposed sewer trench/pipe <br /> j' HDPE HOSE & 3/8" DIA COMP AIR HOSE Q <br /> (2) 4" DIA SCM PVC CHASES W04" DIA <br /> VINYL BRAIDED HOSE & 3/e" DIA COMP AIR HOSE / n <br /> Q % <br /> Q I C•3 , i Possible Future Head Start <br /> 3 Extraction Well 2451 Country <br /> I MW5R . <br /> Club Blvd, <br /> O I <br /> C-4 <br /> 3 <br /> `- Former former former <br /> dispenser UST <br /> UST I island location C <br /> s Location location / O <br /> - RW1A ++ <br /> Current <br /> Extraction Well y <br /> MW-e I v <br /> Current v <br /> \ Extraction F� lstl°g i MW-13 <br /> (2) 4" DIA PVC <br /> Well (1) 2" DIA PJC Exisling Remedlation Trench <br /> r ° (2)4" DIA SCH40 PVC MW3 0 10 20 40 N m° <br /> 3 — — — — (1) z" DIA BeH40 WC i y _ E <br /> _ _ T U <br /> CONNECTTo - - - - - - - - - - - - - FIGURE w m <br /> EXISTING ADDITIO00 <br /> NAL 714Z Scale (ft) N z •rnH 4" DIA PVC PIPE <br /> CdC U Z <br /> / G U o c <br /> m <br /> a \� / COUNTRY CLUB BOULEVARD 1 CLO <br /> l I IL N U) E <br />