Laserfiche WebLink
;I <br /> w <br /> C A M B R I A <br /> which occurred on July 6, 2004. During this carbon changeout, the vessels were reconfigured as <br /> described above. The GWE system was restarted on July 6, 2004. <br /> If you have any questions regarding the scope of work outlined in this work plan, please call Joe <br /> Neely at (707) 933-2361 . <br /> Sincerely, <br /> Cambria Environmental Technology, Inc. <br /> © !� <br /> Joe W. Neely, RG <br />� Senior Project Geologist No, 6927 <br /> RG 6927 <br /> q ��P <br /> �Of CAL1C'O� <br /> cc: Ms. Karen Petryna, Shell Oil Products US <br /> Mr. James Barton, Central Valley Regional Water Quality Control Board <br /> Mr. Dennis Johnson, Shell Oil Products US <br /> 0783 4 <br />