Laserfiche WebLink
C A M B R I A <br /> laboratory report for the required samples taken on January 28, 2005 is presented in Appendix A <br /> Monthly Flow Data Between December 27, 2004 and January 28, 2005, the total discharge to the <br /> sanitary sewer was 21,241 gallons, which corresponds to an average flow rate of 0 46 gallons per <br /> minute <br /> Discussion Cambria shut the GWE system down on December 14, 2004, in anticipation of carbon <br /> replacement Carbon replacement activities commenced on December 27, 2004, but could not be <br /> completed because water service to the abandoned station building had been discontinued Carbon <br /> 19 <br /> replacement activities were completed on January 18,2005,after water service was restored at the site, <br /> and the GWE system was restarted the same day <br /> CLOSING <br /> The signed certification statement is included as Appendix B Thank you for your assistance with this <br /> project Please call Cynthia Vasko at(510)420-3344 if you have any questions <br /> Sincerely, <br /> Cambria Environmental Technology, Inc <br /> Cynthia Vasko <br /> Protect Engineer <br /> Attachments <br /> Table I Groundwater Extraction System Permit Sampling Results <br /> Appendix A Groundwater Extraction System Certified Analytical Report <br /> Appendix B Certification Statement <br /> cc Karen Petryna, Shell Oil Products US <br /> Mike Infurna, San Joaquin County Environmental Health Department <br /> 0783 2 <br />