CAMBRIA
<br /> TPHg Benzene MTBE
<br /> Site Flow Meter Cumulative Flow TPHg Period Cumulative Benzene Period Cumulative MTBE Period Cumulative
<br /> Visit Reading Volume Rate Conc Removal Removal Conc Removal Removal Cone Removal Removal Active
<br /> (mmlddl ) (gal) ( al) ( m) (ppb) (pounds) (pounds) (Ppb) (pounds) (pounds) ( b) ( ands) (poands) Wells Comments
<br /> 05/31/01 20 0 0 0 0 RW-lA Startup samples taken
<br /> 05/31/01 220 200 36,000 0 060 0 060 9,400 0 016 0 016 63 000 0 105 0 105 RW-1A
<br /> Continuous groundwater extraction and
<br /> 06!20101 290 270 000 3,000 0 002 0 062 650 0 000 0 016 21800 0 002 0107 RW 1A sewer discharge began
<br /> 06/25/01 6 950 6 930 0 93 28 000 156 162 5,700 0 317 0 333 16 000 0 889 0 996 RW 1A
<br /> 07/16!01 8 222 9202 004 34 000 0 361 198 91800 0 104 0 437 61 000 0 647 164 RW 1A
<br /> 07/23/01 16,610 16,590 0 83 23,000 161 359 4 600 0 322 0 759 33,000 231 395 RW 1A
<br /> 08/02/01 31,200 31 180 101 47 000 572 931 12,000 146 222 87 000 106 145 RW-1A
<br /> 08/20/01 33 320 33 300 008 44 000 0 778 101 11 000 0195 2 41 99,000 175 163 RW-1 A
<br /> 09/06/01 67 750 67,730 141 50,000 144 245 10 000 287 529 110,000 316 479 RW-1 A
<br /> 09/21/01 96,310 96,290 132 53,000 126 371 91800 234 762 110 000 262 741 RW IA
<br /> 10103!01 98,030 98 010 010 47 000 0 675 378 12,000 0 172 780 150,000 215 763 RW 1A
<br /> 10116!01 100 400 100 380 0 13 45 000 0 890 38 6 12,000 0 237 803 200,000 396 802 RW-1A
<br />� Carbon changeout performed on 11!1!01
<br /> System downtime approximately 12
<br /> 11/08101 104,340 104,320 012 X50,000 0 822 395 12,000 0 395 843 160 000 5 26 855 RW 1A hours
<br /> 11/21/01 109,740 109,720 029 33 000 149 410 9 000 0 406 883 110 000 496 904 RW-1A
<br /> 12/12/01 111,110 111090 005 120,000 137 423 9,700 0111 894 120000 137 918 RW-lA
<br /> 12128101 168 190 168 170 248 33 000 1572 58 0 8 600 4 096 1304 98,000 4669 1385 R W-1 A
<br /> System down due to damaged power
<br /> 01!26102 322,220 322 200 369 55,000 7069 1287 91300 11953 2499 91000 11696 2554 RW-1 A lines Re-started 1110102
<br /> Carbon changeout performed on 2112102
<br /> System downtime approximately 24
<br /> 02/22/02 449,770 449,750 3 28 63,000 67 05 1958 7,900 8 408 3340 78 000 8302 3385 RW-lA hours
<br /> 03/06/02 513 200 513 180 367 13 000 688 2027 1,400 0 741 3414 11,000 582 3443 RW-1A
<br /> 03127!02 569 340 569 320 196 NS 2389 2266 NS 3 513 37 66 NS 3701 3813 RW IA
<br /> 04/01/02 587,495 587,475 252 51,000 773 2343 7 500 1 136 3879 79 000 1197 3933 RW-lA System turned off 411 and restarted 4123
<br /> 04125/02 595,400 595,380 023 44,000 290 2372 7,200 0 475 39 27 87,000 574 3990 RW 1A Carbon changeout performed on 4117!02
<br /> 05/22/02 679 800 679 780 217 57,000 4014 2773 7 500 5 282 4455 69,000 4859 4476 RW-1A
<br /> 06/19/02 769 900 769,880 223 86,000 64 66 3420 7 800 5 864 5041 62 000 46 61 4942 RW 1 A
<br /> 06/26/02 794 831 794,811 2 47 60,000 1248 3545 6,900 1 435 5195 66 000 1373 5079 RW-I
<br /> W-1 A Carbon changeout performed on 7A VD2
<br /> Page 1 of 4
<br /> 0783
<br />
|