Laserfiche WebLink
CAMBRIA <br /> Analytical Results Laboratory analytical results indicate that samples taken from our final discharge <br /> point were below the permit-Specified discharge limits for all analyzed constituents The certified <br /> laboratory report for the required monthly samples collected on August K, 2005 is presented in <br /> Appendix A <br /> Monthly Flow Data Between July 27 and August 15, 2005,the total disi.harge to the sanitary sewer <br /> was I 3,175 gallons, which corresponds to an average flow rate of 0 4 gallons per minute <br /> Discussion The GWE system shut down on August 15, 2005 and remained off for the rest of the <br /> month, pending replacement of carbon and the transfer pump motor starter <br /> CLOSING <br /> The signed certification statement is included as Appendix B Thank you for your assistance with <br /> this project Please call Cynthia Vasko at (510) 420-3344 if you have any questions <br /> Sincerely, <br /> Cambria Environmental Technology, Inc. <br /> C'�A V (�*' G— <br /> Cynthia Vasko <br /> Project Engineer <br /> Attachments <br /> Table 1 Groundwater Extraction System Permit Sampling Results <br /> Appendix A Groundwater Extraction System Certified Analytical Report <br /> Appendix B Certification Statement <br /> cc Denis Brown, Shell Oil Products US <br /> Mike lnfurna, San Joaquin County Environmental Health Department <br /> O\Stockton 2575 Country Club\REMEDIATION\GWE Repons\2005\Sekf Monitonng Aug05 Data\GWE Self Monitoring Aug05 <br /> Data doe <br /> i <br />