Laserfiche WebLink
' ' <br /> C A M B R I A <br /> laboratory report for the required annual samples collected on May 16, 2005 is presented in <br /> Appendix A <br /> Monthly Flow Data Between April 27 and May 27, 2005, the total discharge to the sanitary sewer <br /> was 54,685 gallons, which corresponds to an average flow rate of 1 3 gallons per minute <br /> Discusstvn. On May 31, 2005, Aqua Sierra Controls, Inc of Auburn, California met Cambria <br /> personnel onsite to perform the required semiannual calibration of the flow totalizing meter The <br /> calibration certification is included as Appendix B <br /> CLOSING <br /> The signed certification statement is included as Appendix C Thank you for your assistance with this <br /> project Please call Cynthia Vasko at(510)420-3344 if you have any questions <br /> Sincerely, <br /> Cambria Enviro mental Technology, Inc. <br /> • <br /> Cynthia Vasko <br /> Project Engineer <br /> Attachments <br /> Table 1 Groundwater Extraction System Permit Sampling Results <br /> Appendix A Groundwater Extraction System Certified Analytical Report <br /> Appendix B Flow Totalizing Meter Calibration Certificate <br /> Appendix C Certification Statement <br /> cc Denis Brown, Shell Oil Products US <br /> Mike Infurna, San Joaquin County Environmental Health Department <br /> • <br />