Laserfiche WebLink
C A M B R I A <br /> necessary to remediate this site Continued groundwater monitoring will help determine if the <br /> overexcavation efforts have made a difference <br /> As requested by SJCEHD, we are proposing to replace well MW-5 with MW-5R A work plan <br /> for installing this replacement well is submitted as a separate document along with this report <br /> Cambria is pursuing a discharge rate increase with the City of Stockton for the groundwater <br /> extraction and treatment system operating at this site Once we have obtained perrrussion from <br /> the City of Stockton to increase our discharge rate we plan to increase the capacity of the <br /> treatment system for higher throughput with the goal of enhancing migration control and <br /> increasing mass removal The changes to the remediation system may include increased carbon <br /> vessel size and associated equipment to handle higher flow rates <br /> CLOSING <br /> If you have any questions regarding this document, please call Joe Neely at (707) 933-2361 <br /> • Sincerely, <br /> Cambria Environmental Technology, Inc. <br /> IVIU4L <br /> Joe W Neely,PG cg�p0 W Hoc <br /> Senior Project Geologist <br /> PG 6927 No. 6927 <br /> CAi.IFdP�\! <br /> 0783 7 <br /> I <br />