Laserfiche WebLink
CAMBRIA <br /> report for the required monthly samples, taken on March 25, 2003, is presented as Appendix A <br /> Monthly Flow Data: Between February 25, 2003 and March 25,2003,the total discharge was 87,275 <br /> gallons, which corresponds to an average flow rate of 2 16 gallons per minute <br /> Discussion:Cambria received the City of Stockton's letter, dated March 24,2003, in response to our <br /> request for a modified LEL meter calibration schedule LEL meter calibration has been scheduled <br /> with Aqua Sierra Controls, Inc for Wednesday,April 16, 2003 <br /> CLOSING <br /> The signed certification statement is included as Appendix B Thank you for your assistance with this <br /> project Please call Cynthia Vasko at(510) 420-3344 if you have any questions <br /> Sincerely, <br /> Cambria Environmental Technology, Inc <br /> C <br /> Cynthia Vasko <br /> Senior Staff Engineer <br /> Attachments <br /> Table I Groundwater Extraction System Analytical Results <br /> Appendix A Groundwater Extraction System Certified Analytical Report <br /> Appendix B Certification Statement <br /> cc Karen Petryna, Shell Oil Products US <br /> Mike Infurria, San Joaquin County Environmental Health Department <br /> 0783 2 <br />