Laserfiche WebLink
CAMBRIA <br /> Report Preparation Following the receipt of analytical results from the laboratory, Cambria <br /> will prepare a written report This report will also include a report of the soil assessment and <br /> well installation activities performed in June 2004 Additionally, the report will include a site <br /> conceptual model <br /> Schedule <br /> Our schedule goal is to coordinate this work with upcoming UST removal activities planned for <br /> this site The schedule of the UST removal activities is currently pending permit approval As <br /> soon as we learn of the schedule for UST removal we will notify EHD staff of the schedule for <br /> overexcavation activities <br /> If you have any questions regarding the scope of work outlined in this work plan, please call Joe <br /> Neely at(707) 933-2361 <br /> Sincerely, <br /> Cambria Environmental Technology, Inc. <br /> G,F <br /> Joe W Neely, RG <cO`S�k@� OC <br /> Senior Project Geologist <br /> RG 6927 <br /> OF <br /> Attachments <br /> CAL1 <br /> Table 1 Soil Analytical Data <br /> Figure 1 Site Vicinity/Well Survey Map <br /> Figure 2 Site Map/Historical Soil Chemical Data <br /> Figure 3 Soil Chemical Concentration Map <br /> Appendix A 1995 UST Removal Figure and Data Table <br /> Appendix B Bonng/Well Logs <br /> cc Ms Karen Petryna, Shell Oil Products US <br /> Mr James Barton, Central Valley Regional Water Quality Control Board <br /> Mr Dennis Johnson, Shell Oil Products US <br /> • <br /> 0783 5 <br />